![ABB Arc Guard System TVOC-2 Installation And Maintenance Manual Download Page 47](http://html.mh-extra.com/html/abb/arc-guard-system-tvoc-2/arc-guard-system-tvoc-2_installation-and-maintenance-manual_3045239047.webp)
Installation
45
Power on to the
Arc Monitor
Warning!
Working with high voltage is potentially lethal.
Before switching the power supply on follow the steps below:
1. Check your installation.
2. Check that electrical connections are orderly connected.
3. Check that the configuration is set for your system.
4. Make sure the supply voltage is suitable (100-240V AC/DC 50/60Hz).
5. Make sure you do not leave any working tools in the switching gear.
When the Arc Monitor is connected to supply voltage, then it is on.
Checking power
on Arc Monitor
When the Arc Monitor is on check the following :
• Green LEDs "Power" on left side of detector inputs is lit.
• Green LED "Power" on HMI is lit.
• HMI is showing text.
Summary of Contents for Arc Guard System TVOC-2
Page 1: ...Arc Guard System TVOC 2 Installation and maintenance guide ...
Page 2: ......
Page 8: ...6 ...
Page 10: ...About Arc Guard System 8 ...
Page 54: ...Installation 52 ...
Page 74: ...Human Machine Interface functions 72 ...
Page 82: ...Technical data 80 ...
Page 89: ......