![ABB Arc Guard System TVOC-2 Installation And Maintenance Manual Download Page 35](http://html.mh-extra.com/html/abb/arc-guard-system-tvoc-2/arc-guard-system-tvoc-2_installation-and-maintenance-manual_3045239035.webp)
Installation
33
Connecting exten-
sion module
(option)
Follow this steps to connect extension module to the Arc Monitor:
Warning!
Make sure that supply voltage is switched off!
1. Remove the protection part.
2. Mount the extension module into the contact of the Arc Monitor.
3. Secure the extension module using screwdriver torque 0.6 NM.
To connect second extension module:
1. Remove the protection part from the second extension module.
2. Mount the extension module into the contact of the Arc Monitor.
3. Secure the extension module using screwdriver torque 0.6 NM.
4. Cover the X2 text with label X3 which comes with the addtional extension
module.
3
0.6 Nm
2x
1
2
0.6 Nm
2x
X2
X3
X1
Summary of Contents for Arc Guard System TVOC-2
Page 1: ...Arc Guard System TVOC 2 Installation and maintenance guide ...
Page 2: ......
Page 8: ...6 ...
Page 10: ...About Arc Guard System 8 ...
Page 54: ...Installation 52 ...
Page 74: ...Human Machine Interface functions 72 ...
Page 82: ...Technical data 80 ...
Page 89: ......