Maintenance
Contents of this chapter
This chapter contains maintenance instructions.
Maintenance intervals
The tables below show the maintenance tasks which can be done by the end user. The
complete maintenance schedule is available on the Internet (
).
For more information, consult your local ABB Service representative
(
■
Description of symbols
Description
Action
Inspection (visual inspection and maintenance action if needed)
I
Performance of on/off-site work (commissioning, tests, measurements or other
P
work)
Replacement
R
■
Recommended maintenance intervals after start-up
Years from start-up
Maintenance task/object
…
12
11
10
9
8
7
6
5
4
3
2
1
0
Coolant
P
P
P
P
P
P
P
P
P
P
P
P
P
Checking coolant antifreeze concentration
P
P
P
P
P
P
Checking coolant quality
6
Maintenance 55
Summary of Contents for ACS880-107LC
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 107LC inverter units Hardware manual ...
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 38: ...4 a 8 b 16 18 PE PE 10 38 Electrical installation ...
Page 39: ...13 12 21 Electrical installation 39 11 ...
Page 44: ...With FDPI 02 modules OPEN TERMINATED 1 1 2 2 OPEN TERMINATED 3 44 Electrical installation ...
Page 48: ...48 ...
Page 54: ...54 ...
Page 72: ...72 ...
Page 108: ...108 ...
Page 115: ...Above Sides Front in mm in mm in mm 9 85 250 0 0 59 1500 Technical data 115 ...
Page 124: ...124 ...
Page 130: ...Inverter module cubicle with two R8i modules bottom cable exit 130 Dimensions ...
Page 131: ...Inverter module cubicle with three R8i modules bottom cable exit Dimensions 131 ...
Page 133: ...Cubicle width 300 mm top cable exit Dimensions 133 ...
Page 134: ...Cubicle width 400 mm bottom cable exit 134 Dimensions ...
Page 135: ...Cubicle width 400 mm top cable exit Dimensions 135 ...
Page 136: ...Cubicle width 600 mm bottom cable exit 136 Dimensions ...
Page 137: ...Cubicle width 600 mm top cable exit Dimensions 137 ...
Page 138: ...138 ...