CHAPTER 6 – ELECTRICAL INSTALLATION
102
—
6.10 Auxiliary power, control and
serial communication cables
The method to prepare the auxiliary power and control cables for
connection is described below.
6.10.1 Further information
• Project-specific cable entry
• Dimensions between point of cable entry and
terminals
See
Appendix D – Wiring diagrams
for information
on:
• Conventions for cross-references and device
identification
• Terminal designations
—
The power feed for the auxiliary
supply must be protected with a
suitable circuit protection rated
for the inrush current. For infor-
mation, see
utility consumption
list of
the drive.
6.10.2 Preparing the cable entry and the cables
Determining the cable length
1. Determine the required length of a cable
between the point of entry and the connection
point inside the cabinet.
2. Cut the cable to the required length before con-
nection.
!
See
Layout drawing
in
Appendix C –
Mechanical drawings
for information on:
Summary of Contents for ACS2000 AFE 2MVA
Page 8: ...General information on manual and equipment ...
Page 13: ...13 ACS2000 AFE 2MVA UM 3BHS355653 ZAB E01 REV H ...
Page 14: ...Terms abbreviations trademarks ...
Page 19: ...19 ACS2000 AFE 2MVA UM 3BHS355653 ZAB E01 REV H ...
Page 20: ...Important note on main circuit breaker ...
Page 48: ...Chapter 3 Control system 49 Control unit 50 Main components 55 I O interfaces ...
Page 69: ...69 ACS2000 AFE 2MVA UM 3BHS355653 ZAB E01 REV H ...
Page 111: ...111 ACS2000 AFE 2MVA UM 3BHS355653 ZAB E01 REV H ...
Page 118: ...Commissioning check list ...
Page 153: ...153 ACS2000 AFE 2MVA UM 3BHS355653 ZAB E01 REV H ...
Page 180: ......