Section 7 Commissioning
This section provides information on the basic operations required for first
commissioning of the controller.
Data backup
Data backup is not possible without a battery when the supply voltage is switched
off.
.
To insert the battery, proceed as described below.
Insertion of the TA 951F battery
Remove the detachable front panel of the CPU module or the display unit installed
in this position. The following drawing shows the mounting position of the battery
behind the fixed housing front part.
The new CPU module housing has been equipped with a battery compartment that
replaces the previously used battery holder.
Module with battery compartment (new)
Push the battery to the left into the battery compartment. It will be locked
in place by the front panel or the display unit.
The use of unsuitable batteries leads to explosion or fire hazards. This is why
exclusively TA 951F lithium batteries must be used for the PM CPU module.
As soon as the battery is connected and the controller is not supplied with
operating voltage, buffering and battery unloading are started.
Summary of Contents for AC 900F
Page 2: ......
Page 3: ...Freelance 2016 Mounting and Installation Instructions AC 900F Controller ...
Page 58: ...CP C MM messaging module Section 3 Modules 58 M I AC 900F Controller ...
Page 70: ...TB 870F terminal block Section 4 Accessories 70 M I AC 900F Controller ...
Page 122: ...Update Restore Section 8 Service 122 M I AC 900F Controller ...
Page 152: ...CP A CM Section 9 Technical Data 152 M I AC 900F Controller ...
Page 154: ...Index 154 M I AC 900F Controller ...
Page 155: ......