Gemini 2000 Installation Manual v1.3
17
Floor must be sound, solid and even surface.
Attention should be paid to the footplate area which will be drilled to a depth of 100mm
and must be of sound construction with no buried services in foot plate area.
Bath breakdown reversal
If the bath required breaking down (covered on pages 10-12), and after carefully carrying the
various components onto site, It is now time to begin reassembling the bath ready for
installation.
Using the foot fixing template bellow, pay attention to where the bath will be positioned.
Position the bath near the final installation site, but make sure there is enough clearance to get
to every side of the bath for installation.
To reassemble the bath to the state presented on arrival reverse the process shown during
pages 11,12 and 13.
Ensure that there is silicone grease in the seal area and the seals are free from any dirt.
Reconnect the actuators ensuring they are firmly clipped into place, and that no cables are
trapped.
HEAD END
TAP END