GEMINI 2000 ON SITE ASSEMBLY AND INSTALLATION INSTRUCTIONS
The bath will come in a partly built state on a pallet, with all panels boxed separately.
Depending on the individual bath location, the bath may require some break down to
safely get it on site.
Where access allows, taking the bath into the property without any breakdown in
preferable.
Preparation
a) Carefully remove all packaging and inspect all components thoroughly. Note: Do not use
sharp knives or instruments to remove packaging around the finished surface areas of the bath.
b) Ensure all component parts are present before proceeding to remove any existing facilities. It
is important to ensure the complete kit is there. If there are ANY components missing contact
the office and quote the number on the side of the bath
c) Prepare the floor area and ensure it is flat, level and structurally sound & there are
NO
SERVICES BURIED
within the floor fixing area.
Ensure the bath location has suitable clearance for correct installation (When the bath is in the
room it may be difficult to move once fully assembled. Please refer to the detailed layout plan
provided on page 14.
D) All panels and contents should come labelled to help simplify assembly and installation.
Check that all contents is labelled prior to install.
Gemini 2000 Installation Manual v1.3
13
Items
Items supplied with the kit should be as
follows:
• Installation Manual (this booklet)
• User Manual
• Bath unit complete (Bath Shell, belly pan,
frame, control pack, platform support
rods, Platform)
• Bath Surround Panels – top, middle, foot
end side panels, bottom end panels and
bellows.
• Flexible water feed pipes x2
• User Handset
• Bath Shower Mixer Tap (TMV) –
optional
• Backrest and cover
• Footrest (optional)
• Dispatch kit (Floor fixing kit, panel
bolts/washers, plumbing kit, cable ties
etc).