3500
kg
5.
8
Operating Instructions
22
4 Post Parking Hoist
OPERATING INSTRUCTIONS
The hoist should only be operated by personnel that have been thoroughly trained in
operation and maintenance of the hoist.
1. Park the vehicle evenly on the platforms, turn off the
engine and apply the park brake.
2. Ensure all wheel chocks (stops) are in position prior to raising the hoist.
3. Make sure that all personnel are clear and there are no obstructions around the
hoist.
TO RAISE THE HOIST
1. Turn on the power to the hoist.
2. Press the “UP” button on the control box until the desired working height is
obtained checking for any obstructions.
3. Once the hoist has reached the desired working height, lower the hoist onto the
safety locks by means of pushing the lowering leaver on the hydraulic power
unit.
Note: Check for correct engagement of each lock.
TO LOWER THE HOIST
1. Raise the hoist 50mm or until the locks are clear.
2. Hold down the locking lever and push on the lowering valve at the same time.
3. Check for any obstructions under the hoist when lowering and all personnel are
clear of the area.
4. When the hoist has been lowered to the ground, remove the wheel chocks.
5. Switch off power to the hoist.
Please note: this hoist is supplied with movable castor wheels and is only designed
to transport the hoist without a vehicle. Do not attempt to maneuver the hoist with a
vehicle on it. Doing so may cause injury to personnel.
For service PH: 08 9279 1663
MODEL:
AutoLift AL-10000T
SERIAL NO.:
APPROVAL No.
WAH21804
Summary of Contents for AutoLift AL-10000T
Page 13: ...12 ...
Page 30: ...曹营 7 Explosion Diagrams and Parts List 7 1 Explosion Diagrams 29 ...
Page 31: ...气飞 30 ...
Page 32: ...31 ...
Page 33: ...4 3 32 ...
Page 35: ...10 34 ...