6. Install the Column TOP CAPS using the M1
2
x 2 Hex
Bolts, nuts & washers. Install the nut on each Safety Lad-
der until
12mm
of threads are exposed and the Ladder is
raised at least
12mm
off of the base of the Column.
NOTE: Raise the Ladder at least
12mm
off of the base of
the Column or damage to the
hoist
will occur. Be sure to
position the cable hole INWARD. (See Fig. 4.6 - 4.7)
1. Before proceeding it will be necessary to first raise
the Cross
Beams
off the ground to facilitate
Cable routing and final assembl
y.
2. Manually raise the Cross
Beams
until the Primary
Safety Locks engage and rest on the lock position second
down from the top of the Ladder or approximately
700mm
off the ground. It is important that the SLACK SAFETY
LOCK IS CLEARED. The Slack Safety Lock must never
rest on the Safety Ladder. To prevent this, manually hold
the Slack Safety in the disengaged position while
lowering the cross
beams
ends. (See Fig. 5
.1)
3. The Columns and Cross
Beams
will now be in
po
sition and spaced properly for the Runways. Be very
careful not to disturb the Columns and Cross
Beams
at this time as they may tip over causing personal
injury or harm. (See Fig. 5.2)
DANGER!
Be careful not to disturb the Columns and Cross
beam
as they may tip over causing personal injury or harm.
IMPORTANT NOTE !
It is important that the SLACK SAFETY LOCK IS
CLEARED. The Slack Safety Lock must never rest on
the Safety Ladder.
Fig 4.7
Fig 5.1
Fig 5.2
Fig 4.6
Slack wire rope lock
engaged
Slack wire rope lock
disengaged
700mm
4.5 Raising the Crossbeam
10
Summary of Contents for AutoLift AL-10000T
Page 13: ...12 ...
Page 30: ...曹营 7 Explosion Diagrams and Parts List 7 1 Explosion Diagrams 29 ...
Page 31: ...气飞 30 ...
Page 32: ...31 ...
Page 33: ...4 3 32 ...
Page 35: ...10 34 ...