4.6.
Powerside Runway Installation
1. Locate the Powerside Runway easily identified by the
Cylinder and Sheave roller mounting structures welded on the
underside. The Powerside Runway will be
positioned on the
side of the hoist where the power unit is installed.
(See Fig.
6
.1)
2
. Position the Powerside Runway on top of the Cross
Beams
with the utility rail towards the center. The Flex
Tube Holes located at the side of the Powerside Runway
should be adjacent to the Power Unit Column. Align the
holes in the Runway with the holes on the Cross
Beams
and bolt together
the front stop plates
using four M12 x
1.75 x 90 Hex Head Bolts and Washers.
See notes on
Final Assembly 4.11
4.7
Offside Runway Installation
1. Position the Offside Runway on top of the Cross
Beams
with the Utility Rail located inside. Determine the desired
location of the Offside Runway. Align the holes in the
Runway with the desired holes on the Cross
Beams
and
bolt together the ramp brackets with
Hex Head Bolts and
Washers.
See notes on Final Assembly 4.11
DANGER !
DO NOT PROCEED with Cable installation or go near
the hoist work area unless visual confirmation is made of
ALL Safety Locks. ALL locks MUST be engaged before
proceeding. Failure to comply with these instructions may
result in severe personal injury or death.
Fig
6
.1
Fig
6
.4
Fig
7
.1
11
Summary of Contents for AutoLift AL-10000T
Page 13: ...12 ...
Page 30: ...曹营 7 Explosion Diagrams and Parts List 7 1 Explosion Diagrams 29 ...
Page 31: ...气飞 30 ...
Page 32: ...31 ...
Page 33: ...4 3 32 ...
Page 35: ...10 34 ...