2
. Tighten each Nut until there is at least
25mm
of
threads protruding through the top of the nut. The Cables
will remain loose until start up and final Cable
adjustments are made. (See Fig.
7
.4)
3.
After routing the Cables double-check to make sure
all are properly positioned and remain within the grooves
of ALL Sheaves. (See Fig.
7
.5 -
7
.6)
1. Mount the Power Unit to the Mounting Bracket using
the M8 Hex Head Bolts and Nylock Nuts then fill
the reservoir with 1
5
litres of 32 grade hydraulic oil.
(See Fig.
8
.1)
DANGER!
DO NOT PERFORM ANY MAINTENANCE OR
INSTALLATION OF ANY COMPONENTS WITH OUT
FIRST ENSURING THAT ELECTRICAL POWER HAS
BEEN DISCONNECTED AT THE SOURCE OR PANEL
AND CANNOT BE RE-ENERGIZED UNTIL ALL
MAINTENANCE AND/OR INSTALLATION
PROCEDURES ARE COMPLETED.
DANGER !
ALL WIRING MUST BE PERFORMED
BY A LICENSED ELECTRICIAN.
Fig 8.4
Fig
7
.5
Fig
7
.6
Fig
7
.3
Fig
8
.1
4.8
Power Unit Installation & Electrical
Connections
13
Summary of Contents for AutoLift AL-10000T
Page 13: ...12 ...
Page 30: ...曹营 7 Explosion Diagrams and Parts List 7 1 Explosion Diagrams 29 ...
Page 31: ...气飞 30 ...
Page 32: ...31 ...
Page 33: ...4 3 32 ...
Page 35: ...10 34 ...