Supplier
The Innovo water heater is designed in accordance with the applicable regulations. The
water heater is delivered with the CE-marking and all necessary documentation to obey
these regulations. See the compliance section. (on page 4)
A.O. Smith accepts no liability for claims from third parties when:
•
The instructions for the correct installation of the water heater are not obeyed.
•
The instructions for the correct use of the water heater are not obeyed.
•
The water heater did not have maintenance on the correct maintenance interval.
For more information, refer to the General Terms of Sales. These are available on request,
free of charge.
We believe that this manual provides you with accurate and complete descriptions of all
relevant components. If you, nonetheless find errors or inaccuracies in this manual, please
inform A.O. Smith. This helps us to further improve our documentation.
Compliance
To safely produce domestic hot water, the design and construction of the Innovo water
heaters is in accordance with:
•
the European Regulations 2016/426 on appliances burning gaseous fuels (GAR).
•
the European Standard for Gas–fired storage water heaters for the production of
domestic hot water (EN89).
•
The European ECO-Design Directive.
•
The European Energy Labeling Directive
Refer to the appendix Declaration of conformity (see 13.5).
Regulations
It is law that all gas appliances are installed by competent persons, in accordance with The
Gas Safety (Installation and Use) Regulations 1998. Failure to install appliances
correctly could lead to prosecution. It is in your own interest, and that of safety, to ensure
that this law is complied with. The installation of the equipment MUST be in accordance
with the relevant requirements of the Gas Safety Regulations, Building Regulations,
I.E.E. Regulations and the bylaws of the local water undertaking.
In addition, the installation should follow the relevant guidance offered in the following
documents. It is not practical to list all relevant information due to continuous changes but
emphasis is placed on the following documents, as failure to comply with the guidance
given will almost certainly result in an unsatisfactory installation:
•
Institute of Gas Engineers and Managers (IGEM) Publications
•
CIBSE Guides
•
Clean Air Act
•
H.S.E Guidance
Note
Manufacturer's notes must not be taken in any way as overriding statutory obligations.
n
4
Summary of Contents for Innovo IR 12-160
Page 6: ...6 ...
Page 13: ...User part 0312266_INNOVO_UKUK_V5 1 2022 07 12 13 ...
Page 14: ...14 ...
Page 16: ...16 User part ...
Page 18: ...18 User part ...
Page 24: ...24 User part ...
Page 27: ...Installation Maintenance and Service part 0312266_INNOVO_UKUK_V5 1 2022 07 12 27 ...
Page 28: ...28 User part ...
Page 36: ...36 Installation Maintenance and Service part ...
Page 56: ...56 Installation Maintenance and Service part ...
Page 58: ...58 Installation Maintenance and Service part ...
Page 70: ...70 Installation Maintenance and Service part ...
Page 83: ...0312266_INNOVO_UKUK_V5 1 2022 07 12 83 ...
Page 87: ...13 4 Electrical wiring diagram 0312266_INNOVO_UKUK_V5 1 2022 07 12 87 ...
Page 89: ...13 5 Declaration of conformity 0312266_INNOVO_UKUK_V5 1 2022 07 12 89 ...
Page 90: ......
Page 91: ......
Page 94: ...92 Installation Maintenance and Service part ...