Code and description
Cause
Measure
F05
(lock out error)
Flame error
Too many flame failures
are detected
Recirculating flue gases due too
incorrect roof or wall flue terminal.
-
Make sure the flue terminal is installed
correctly, refer to Venting system (see
8.7). If necessary, connect the correct
flue terminal.
-
Make sure that the terminal is
installed correctly, refer to Venting
system (see 8.7). If necessary connect
the flue terminal correctly.
-
Make sure that there are no flue gas
leaks to the rest of the venting
system.If necessary reconnect the
venting system and replace any
damaged seals.
-
Make sure that the flue terminal
discharges into a permitted area.
-
Make sure that the CO
2
-value
measured in the flue gas outlet is
correct, refer to CO
value (see
8.9.4).
-
Make sure that the CO
2
value
measured in the air inlet is below
0.5 vol%.
-
If necessary, reconnect the venting
system and change the necessary
seals.
No sufficient gas supply.
Make sure that the gas supply pressure is
correct.
Supply voltage too low.
-
Make sure that the supply voltage on
the controller is correct.
-
If the supply voltage is below the
stated tolerance and the error
persists, contact your maintenance
and service engineer.
-
Install an isolating transformer.
F07
(lock out error)
Ionisation error
Ionisation measured after
the gas control valve was
closed
Defective gas control valve.
-
Make sure that there is no flame after
the gas control valve has closed.
-
If there is a flame, the gas control
valve must be replaced.
F08
(lock out error)
Ionisation error
Ionisation measured
before the gas control
valve was opened
Defective safety relay.
-
Reset the controller.
-
If error appears again, replace the
controller.
F09
(lock out error)
Temperature error
Temperature, in the tank is above the
97ºC.
-
See measure of error
E01
.
-
Make sure that the wiring between 1
and 7 of J9 is connected and not
damaged.
-
If necessary, replace or reconnect the
wiring.
-
When the wiring is reconnected, reset
the controller.
78
Installation, Maintenance and Service part
Summary of Contents for Innovo IR 12-160
Page 6: ...6 ...
Page 13: ...User part 0312266_INNOVO_UKUK_V5 1 2022 07 12 13 ...
Page 14: ...14 ...
Page 16: ...16 User part ...
Page 18: ...18 User part ...
Page 24: ...24 User part ...
Page 27: ...Installation Maintenance and Service part 0312266_INNOVO_UKUK_V5 1 2022 07 12 27 ...
Page 28: ...28 User part ...
Page 36: ...36 Installation Maintenance and Service part ...
Page 56: ...56 Installation Maintenance and Service part ...
Page 58: ...58 Installation Maintenance and Service part ...
Page 70: ...70 Installation Maintenance and Service part ...
Page 83: ...0312266_INNOVO_UKUK_V5 1 2022 07 12 83 ...
Page 87: ...13 4 Electrical wiring diagram 0312266_INNOVO_UKUK_V5 1 2022 07 12 87 ...
Page 89: ...13 5 Declaration of conformity 0312266_INNOVO_UKUK_V5 1 2022 07 12 89 ...
Page 90: ......
Page 91: ......
Page 94: ...92 Installation Maintenance and Service part ...