Hacousto Holland bv
Industrieweg 87
2651BC Berkel & Rodenrijs
4EVAC Compact 500 quick guide
DoP OD 16.47
Author:
DD
Design revision:
2.0
Page 23 of 33
7.
Startup and commissioning
Finally, all hardware is set up, all connections are made and system is ready to run. Time to power it up!
Power-on / power-off sequence
NOTE: To avoid unwanted audio and visual effects related to the
relatively high energy pulse at system inrush, always plug or
unplug the battery fuse when the system is powered from the
mains supply.
Power the system up and down according to the following steps:
Power on sequence:
1.
Turn on MAINS switch (M)
2.
Plug in the battery fuse (B)
Power off sequence:
1.
Unplug the battery fuse (B)
2.
Turn off MAINS switch (M)
Battery setting
There is a DIP-switch located on the charger board. The two
last bits (switches) on this 4-bit switch should be adjusted to
the rated capacity of the battery, according to the table below.
B
M