International - ENG
February 2021
3M-Matic
™
7000r-I / 7000r3-I Pro
- Type 11700
Original Instructions
Page 20
Source
Document
for
all
related
Manuals/Translations
44-0009-2165-8 / ECO# 0078045
6.1 Uncrating
The envelope attached to shipping
box contains the uncrating instruc-
tions of the machine
(Figure 6-1).
Cut straps. Cut out staple positions
along the bottom of the shipping box
(or remove staples with an appro-
priate tool
- Figure 6-2)
. After cut-
ting out or removing the staples,
lift the shipping box in order to clear
the machine (two persons required).
Transport the machine with a fork-
lift truck to the operating position.
Lift the pallet at the point indicated
in
Figure 6-3
(weight of m
pallet = See Specifications).
Removal of Pallet
Loosen and remove nuts and brackets
using the open end spanner supplied
in the tool box
(Figure 6-4).
A cardboard box is located under
the machine body. Retrieve instruc-
tion manual for additional set-up
procedures. The box also contains
parts removed for shipping, spare
parts and tools
(Figure 6-5).
6.2 Disposal of Packaging Materials
The
7000r-I / 7000r3-I Pro
package
is composed of:
- Wooden pallet
- Cardboard shipping box
- Wooden supports
- Metal fixing brackets
- PU foam protection
- PP plastic straps
- Dehydrating salts in bag
- Special bag of laminated polyester/
aluminium/Polyethylene
(sea freight package only)
- Polyethylene protective material
For the disposal of the above
materials, please follow the
environmental directives or the
law in your country.
Figure 6-1
Figure 6-4
Fasteners
Figure 6-5
6. Unpacking
Figure 6-2
Figure 6-3