3D Systems, Inc.
35
p/n: 15-D99, rev. C
9
FACILITY REQUIREMENTS CHECKLIST
In the sections that follow, you will find all the requirements your facility must meet before your DMP Flex 350 system
can be installed.
After your facility meets all these requirements, complete and sign the
it to 3D Systems Customer Support for review.
When Customer Support receives your completed checklist, a 3D Systems representative will contact you to verify your facility’s
readiness. When the representative is confident that all facility requirements are met, he or she will schedule a trip to your site
to install the DMP Flex 350 system and any additional equipment which was ordered.
NOTE: All facility requirements must be met before 3D Systems can schedule a trip to your facility to install the
equipment.
9.1 How to Submit
Submit your completed Facility Requirements Checklist by uploading it fax, mail, or email to one of the 3D Systems Customer
Support sites below. This notifies them that your facility is fully prepared for installation.
COMMUNICATION FORMAT
NORTH & SOUTH AMERICA, ASIA PACIFIC
EUROPE
3D Systems Corporation
333 Three D Systems Circle
Rock Hill, SC 29730
Attn: Customer Support
3D Systems GmbH
Waldecker Strasse 13
D-64546 Moerfelden Walldorf
Germany
Attn: Customer Support
Be sure to include the date you submitted your completed checklist so installation can be scheduled as quickly
as possible!
If you need to speak to a 3D Systems Customer Support representative about your facility requirements, please visit this page
for the support phone number for your specific region:
.