64
C
HAPTER
4: B
ASIC
C
ONFIGURATION
OF
P
ORTS
, P
ATHS
,
AND
C
ONNECTORS
PPP over ATM can be configured to terminate at the router or configured
to support VPN tunnel switching.
To configure PPP over ATM to terminate at the router, follow these steps:
1
Configure the virtual circuit identifier (VCID) using:
ADD !<vport> -ATM PermVirCircuit <vcid> <vpi>.<vci> [ LLCSNAP | [
NULL IP | IPX | PPP ] ] [<shaperid>]
A PPP session is configured as one PVC on one virtual port. A PVC
requires the association of a unique virtual circuit identifier (VCID) to the
ATM service provider’s VPI.VCI. The PVC supports either LLCSNAP or
NULL PPP.
2
Configure the virtual port as PPPATM using:
ADD !<vport> -POrt VirtualPort <path> PPATM VCID <vcid>
The virtual port owner must be configured as PPPATM. The PVC
configured for the virtual port is bound to the virtual port. Data received
on the PVC will be tagged as received on the virtual port and passed to
PPP.
To configure PPP over ATM to support VPN tunnel switching, follow these
steps:
To configure PPP over ATM to support VPN tunnel switching, the virtual
path is configured (not the virtual port). The PPP over ATM virtual path is
bound to the tunnel switch virtual port when the VPN tunnel switch is set
up.
1
Configure the PVC to be used for the virtual path using:
ADD !<path> -ATM PermVirCircuit <vcid> <vpi>.<vci> CSNAP | [ NULL
IP | IPX | PPP ] ]
2
Configure the virtual path using:
ADD -PAth VirtualPath <path> PPATM VCID <vcid>
3
Complete the configuration of the tunnel client, tunnel switch, and
tunnel terminator.
Completing the configuration of the tunnel client, tunnel switch and
tunnel terminator requires the configuration of:
■
the VPN network. See
Configuring Virtual Private Networks
in
Using
Enterprise OS Software
.
Summary of Contents for 3C8S5007 - SuperStack II PathBuilder S500...
Page 12: ......
Page 24: ...24 CHAPTER 1 OVERVIEW OF THE PATHBUILDER SWITCH...
Page 36: ...36 CHAPTER 2 INSTALLING THE HARDWARE...
Page 48: ...48 CHAPTER 3 LOGGING ON AND PERFORMING ADMINISTRATIVE TASKS...
Page 66: ...66 CHAPTER 4 BASIC CONFIGURATION OF PORTS PATHS AND CONNECTORS...
Page 76: ...76 APPENDIX A SERIAL DEVICES...
Page 82: ...82 APPENDIX B TECHNICAL SUPPORT...
Page 106: ...106 APPENDIX C CONNECTORS AND CABLES...
Page 110: ...110 APPENDIX D CUSTOMIZING YOUR SOFTWARE...
Page 138: ...138 APPENDIX E TROUBLESHOOTING...
Page 142: ...142 APPENDIX F RELOADING THE SYSTEM SOFTWARE...
Page 166: ...166 APPENDIX H COMPLETING THE ATM CONFIGURATION...
Page 178: ...178 APPENDIX I COMMANDS AND PARAMETERS FOR ULTRA WAN CSU DSU INTERFACES...