22
C
HAPTER
1: O
VERVIEW
OF
THE
P
ATH
B
UILDER
S
WITCH
Figure 5
Front Panel (model S590)
Figure 6
Front Panel (model S593/S595)
Figure 7
Front Panel (model S598)
Put the new front panel drawing S590 here.
PathBuilder S500 Series
LAN 1 and LAN 2
Ethernet
connectors
Carrier, Alarm,
and Lpbk LEDs
Console
connector
Run, Load,
and Test LEDs
Status
LEDs
Fwd and
Power/
Fault LED
®
Run
Load
Test
Status
Fwd
Power
/Fault
Console
SYSTEM
100Mb
LAN 1
Link
Active
Fault
Reset
100Mb
LAN 2
Link
Active
Fault
Serial/WAN
1
2
Link, Active, Fault,
and 100Mb LEDs
4A
4B
4C
4D
Carrier
Alarm
Lpbk
3A
3B
3C
3D
Link
Active
Fault
Ultra-WAN CSU/DSU connectors
Flex-WAN serial connectors
Reset
PathBuilder
S500 Series
LAN 1 and LAN 2
Ethernet
connectors
Link, Active, and
Fault LEDs
Console
connector
Run, Load,
and Test LEDs
Status
LEDs
Fwd and
Power/
Fault LED
®
Run
Load
Test
Status
Fwd
Power
/Fault
Console
SYSTEM
100Mb
LAN 1
Link
Fault
Active
Reset
100Mb
Link
Fault
Active
LAN 2
WAN 1
Link
Fault
Active
Link
Fault
Active
WAN 2
Link
Fault
Active
Link
Fault
Active
WAN 1
use HSSI or BNC connectors
WAN 2
use HSSI or BNC connectors
Link, Active, Fault,
and 100Mb LEDs
PathBuilder S500 Series
LAN 1 and LAN 2
Ethernet
connectors
Console
connector
Run, Load,
and Test LEDs
Status
LEDs
Fwd and
Power/
Fault LED
®
Run
Load
Test
Status
Fwd
Power
/Fault
Console
SYSTEM
100Mb
Link
Fault
Active
LAN 1
Reset
100Mb
Link
Fault
Active
LAN 2
Link, Active, Fault,
and 100Mb LEDs
WAN
4A
4B
4C
4D
Carrier
Alarm
Lpbk
3A
3B
3C
3D
Carrier
Alarm
Lpbk
Reset
Carrier, Alarm,
and Lpbk LEDs
Ultra-WAN connectors
Summary of Contents for 3C8S5007 - SuperStack II PathBuilder S500...
Page 12: ......
Page 24: ...24 CHAPTER 1 OVERVIEW OF THE PATHBUILDER SWITCH...
Page 36: ...36 CHAPTER 2 INSTALLING THE HARDWARE...
Page 48: ...48 CHAPTER 3 LOGGING ON AND PERFORMING ADMINISTRATIVE TASKS...
Page 66: ...66 CHAPTER 4 BASIC CONFIGURATION OF PORTS PATHS AND CONNECTORS...
Page 76: ...76 APPENDIX A SERIAL DEVICES...
Page 82: ...82 APPENDIX B TECHNICAL SUPPORT...
Page 106: ...106 APPENDIX C CONNECTORS AND CABLES...
Page 110: ...110 APPENDIX D CUSTOMIZING YOUR SOFTWARE...
Page 138: ...138 APPENDIX E TROUBLESHOOTING...
Page 142: ...142 APPENDIX F RELOADING THE SYSTEM SOFTWARE...
Page 166: ...166 APPENDIX H COMPLETING THE ATM CONFIGURATION...
Page 178: ...178 APPENDIX I COMMANDS AND PARAMETERS FOR ULTRA WAN CSU DSU INTERFACES...