![Zte ZXSDR BS8800 C200 Скачать руководство пользователя страница 161](http://html1.mh-extra.com/html/zte/zxsdr-bs8800-c200/zxsdr-bs8800-c200_installation-manual_940276161.webp)
Figures
00 Appearance............................. 7
Figure 2 Installation Flow..................................................... 9
Figure 3 Installation Space Requirement ...............................12
Figure 4 Crate Unpacking ...................................................21
Figure 5 Cabinet Installation Flow ........................................24
Figure 6 Single-cabinet Installation Position ..........................25
Figure 7 HOLING ...............................................................25
Figure 8 INSULATION SLEEVE INSTALLATION ........................26
Figure 9 EXPANSION NUT INSTALLATION ..............................26
Figure 10 INSULATION SHEET INSTALLATION........................26
Figure 11 BASE INSTALLATION ASSEMBLY (1) .......................27
Figure 12 BASE INSTALLATION ASSEMBLY (2) .......................27
Figure 13 FIXING CABINET (1) ............................................28
Figure 14 FIXING CABINET (2) ............................................29
Figure 15 CABINET INSTALLATION COMPLETION ...................30
Figure 16 Baseband-RF Cabinet Internal Structure .................32
Figure 17 RF SUBRACK APPEARANCE ...................................33
Figure 18 BASEBAND SUBRACK APPEARANCE........................33
Figure 19 SCREW POSITIONS ON RF MODULE .......................34
Figure 20 Screw Position ....................................................35
Figure 21 BBU Installation ..................................................36
Figure 22 M6×16 Screw Position..........................................36
Figure 23 HORIZONTAL MODULE INSTALLATION ....................37
Figure 24 Dustproof Assembly Installation ............................38
Figure 25 Vertical Module Installation ...................................39
Figure 26 Cable Installation Flow .........................................42
Figure 27 DC POWER CABLE APPEARANCE ............................43
Figure 28 DC Power Cable Inlet ...........................................44
Figure 29 Power Distribution Subrack Connection...................45
Figure 30 Power Cable Installation Completion.......................46
Figure 31 Ground Cable Installation .....................................47
Figure 32 Data Cable Appearance ........................................48
Figure 33 Data Cable Installation Completion ........................49
Figure 34 Abis/Iub Interface 75 Ω E1 Cable Appearance..........50
Confidential and Proprietary Information of ZTE CORPORATION
153
Содержание ZXSDR BS8800 C200
Страница 6: ...List of Glossary 159 ...
Страница 9: ......