![Zte ZXSDR BS8800 C200 Скачать руководство пользователя страница 56](http://html1.mh-extra.com/html/zte/zxsdr-bs8800-c200/zxsdr-bs8800-c200_installation-manual_940276056.webp)
ZXSDR BS8800 C200 Installation Manual
F
IGURE
32 D
ATA
C
ABLE
A
PPEARANCE
1.
Ground terminal
2.
E1/T1 cable
3.
RS232/RS485
4.
Dry contact input/output
Steps
1. Connect the data cable to the “Monitoring/Abis” interface of FS
module and screw down two bolts at the junction.
2. Connect End B1 to the ground terminal of cabinet.
3. Connect End B2 to the DB44 connector of E1/T1 cable and
screw down two bolts at the junction.
4. Connect End B3 to the DB9 connector of RS485/RS232 en-
vironment monitoring cable and screw down two bolts at the
junction.
5. Connect End B4 to the DB25 connector of the external dry con-
tact cable and screw down two bolts at the junction.
E
ND OF STEPS
.
Result
The data cable is installed completely, as shown in
48
Confidential and Proprietary Information of ZTE CORPORATION
Содержание ZXSDR BS8800 C200
Страница 6: ...List of Glossary 159 ...
Страница 9: ......