![Zte ZXSDR BS8800 C200 Скачать руководство пользователя страница 127](http://html1.mh-extra.com/html/zte/zxsdr-bs8800-c200/zxsdr-bs8800-c200_installation-manual_940276127.webp)
Chapter 8 Installing Main Antenna Feeder System
pole. Connect the enhanced masts with the support pole by
a connector. Then connect the enhanced mast foundations
with the enhanced masts. Fix every foundations on the roof
with two M10×45 expansion bolts and make sure junctions
of enhanced masts not be twisted.
vi. Connect the support pole 2 to the support pole 1 with six
M10×80 bolts.
vii. If the antenna rack on the roof is not welded with an out-
door cable tray, or the outdoor cable tray welded with the
antenna rack is not connected with the lightning net of
building, the antenna rack base must be connected with
the lightning net via a lightning junction bar.
viii.Cover a layer of antirust paint on the surface of all welded
parts and the rack base. Cover concrete on the antenna
rack base, enhanced mast and expansion bolts.
Installing the rack inconvenient to fix on the roof with a wall
When it is inconvenient to install the rack on the roof, if the roof
is surrounded by the wall, install it onto the wall, as shown in
F
IGURE
109 I
NSTALLING
A
NTENNA
R
ACK ON THE
W
ALL
1.
M12×120 expansion bolt
2.
V-shape connector
3.
180°connector
4.
M12×140 bolt
5.
Fastness board
If the height of wall is not less than 1200 mm, fix the sup-
port pole on the wall with expansion bolts and fixation clips, as
shown in
.
Confidential and Proprietary Information of ZTE CORPORATION
119
Содержание ZXSDR BS8800 C200
Страница 6: ...List of Glossary 159 ...
Страница 9: ......