![Zte ZXSDR BS8800 C200 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/zte/zxsdr-bs8800-c200/zxsdr-bs8800-c200_installation-manual_940276051.webp)
Chapter 6 Installing Cable
Note:
�
The trunk should be selected according to the on-site situation.
�
Generally, the GPS jumper is installed before delivery.
Installing DC Power Cable
Prerequisite
1. Lay out the route and length of cables along a cable tray be-
tween the power cabinet and the ZXSDR BS8800 C200. The
power cable and the protective ground cable should be sepa-
rately arranged and banded from other cables. The banding
distance per segment is 200 mm. The 0.2 m~0.5 length at
both ends is reserved.
Note:
The power cable and the protective ground cable should be
intact and avoid joints appearing in the middle of cables.
2. Make sure the power supply output cut off.
Danger:
Make sure checking the status of circuit breaker inside the
power cabinet. Prohibit installing power cables in a live sta-
tus.
Context
There are two DC power cables, made up of strands of flame-
retardant wire. The cross sectional area of DC power cable is 16
mm
2
. One is a -48V blue power input cable and the other is a
black ground cable.
The appearance of DC power cable is as shown in
.
F
IGURE
27 DC POWER CABLE APPEARANCE
Steps
1. Make blue and black cables with 16 mm
2
cross sectional area
and connect their one ends to the power cabinet. The other
ends of blue and black cables are reserved for standby.
Confidential and Proprietary Information of ZTE CORPORATION
43
Содержание ZXSDR BS8800 C200
Страница 6: ...List of Glossary 159 ...
Страница 9: ......