![Zte ZXSDR BS8800 C200 Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/zte/zxsdr-bs8800-c200/zxsdr-bs8800-c200_installation-manual_940276053.webp)
Chapter 6 Installing Cable
F
IGURE
29 P
OWER
D
ISTRIBUTION
S
UBRACK
C
ONNECTION
1.
—48V RTN
2.
—48V DC
Caution:
Refer to
to connect the positive and negative elec-
trodes of power cable and make sure not connection in reverse.
6. Refix the protective cover to the power distribution subrack.
E
ND OF STEPS
.
Result
The installation of power cable is completed, as shown in
.
Confidential and Proprietary Information of ZTE CORPORATION
45
Содержание ZXSDR BS8800 C200
Страница 6: ...List of Glossary 159 ...
Страница 9: ......