ZXC10 CBTS I2 Installation Manual
42
Confidential and Proprietary Information of ZTE CORPORATION
Adjustable Base Installation Procedure
Take following steps for adjustable base installation mode:
1.
Cabinet positioning
Determine cabinet location according to specific engineering design
drawing.
2.
Adjustable base positioning
Use lineation model to determine position of cabinet base and draw
lines according to provided template. If template is not available
determine holes position according to engineering design drawings.
Figure 18 illustrates this process.
F
I G U R E
1 8
-
H
O L E S
P
O S I T I O N I N
A
D J U S T A B L E
B
A S E
I
N S T A L L A T I O N
M
O D E
( U
N I T S M M
)
3.
Drilling holes
For M12 expansion bolt, use
φ
14 drilling bit to drill 3.14 inch (80 mm)
deep hole. Use vacuum cleaner to clean dust meanwhile.
4.
Installing expansion bolt
Put tubes in drilled holes and hammer them and insert expansion bolts.
Fix bolt with nut and remove nut for cabinet installation. Figure 19
illustrates this process.
F
I G U R E
1 9
-
E
X P A N S I O N
B
O L T S
I
N S T A L L A T I O N
Содержание ZXC10 CBTS O1
Страница 4: ...This page is intentionally blank ...
Страница 10: ...This page is intentionally blank ...
Страница 162: ......