ZXC10 CBTS I2 Installation Manual
110
Confidential and Proprietary Information of ZTE CORPORATION
Figure 90 shows NJ-9 GPS connector parts.
F
I G U R E
9 0
-
N J - 9
G P S
C
O N N E C T O R
P
A R T S
1
2
3
4
5
6
7
8
9
1. Shell
2. Tail connector
3. Air proof washer 1
4. Air proof washer 2
5. Air proof washer 3
6. Insulating washer
7. Insulating washer
8. Insulation plate
9. Inner conductor pin
Connector Preparation Procedure
Take following steps to prepare GPS connector:
1.
Stripping GPS cable shell
Use sharp knife to strip GPS cable outer covers about 0.41 inch
±
0.009 inch (10.5 mm
±
0.25 mm). Avoid damaging inner copper wires.
Figure 91 shows stripped cable.
F
I G U R E
9 1
-
S
T R I P P I N G
G P S
C
A B L E
±
10.5 mm
0.25 mm
Содержание ZXC10 CBTS O1
Страница 4: ...This page is intentionally blank ...
Страница 10: ...This page is intentionally blank ...
Страница 162: ......