Chapter 1 Installation Overview
1-3
GPS installation
Rack
installation
Internal cable
installation
Board
installation
BTSB cabinet installation
Trunk cable
installation
Power supply
system installation
Grounding system
installation
Monitoring system
installation
Antenna system
installation
Fig. 1.1-3 BTSB Installation Hardware
1.2 BTSB Installation Flow Chart
The normal operation of ZXC10 BTSB I1 depends heavily on the quality of the
installation engineering. The equipment must be installed in a systematic and
standardized way to eliminate stability problems caused by improper installation and
improve the reliability of the system.
This manual introduces the installation of BTSB and its parts step by step in an attempt
to guide the engineering staff in their equipment installation.
The indoor installation of ZXC10 BTSB I1 includes cabinet installation and indoor
cable connection and cabling. Please strictly follow these steps for installation:
1. Fix the rack base to the rack.
2. Position the rack and score & drill to fix it.
3. Install the power cable of the cabinet.
4. Install the monitoring cables and temperature/humidity sensors of the BTSB.
5. Install and connect the trunk cable.
6. Install boards and modules in the cabinet.
7. Connect the RF cable of the cabinet.
Содержание ZXC10 BTSB I1
Страница 4: ......
Страница 16: ......
Страница 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Страница 76: ......
Страница 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Страница 96: ......
Страница 106: ......
Страница 114: ......
Страница 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Страница 158: ......
Страница 174: ......
Страница 180: ......
Страница 186: ...ZXC10 BTSB V1 0 cdma2000 Base Transceiver Station Installation Manual B 4 Fig B 6 1 Antenna Feeder DTF Measurement ...