-iv-
Fig. 10.4-14 Introducing Feeders into the Equipment Room (Method 1)
10-23
Fig. 10.4-15 Introducing Feeders into the Equipment Room (Method 2)
10-23
Fig. 10.5-1 Installation and Lightning Protection of Arrester
10-25
Fig. 10.6-1 Wrapping the Waterproof Adhesive Tapes (1)
10-27
Fig. 10.6-2 Wrapping the Waterproof Adhesive Tapes (2)
10-27
Fig. 10.6-3 Wrapping the Waterproof Adhesive Tapes (3)
10-28
Fig. 11.2-1 Composition of the GPS Antenna Feeder System
11-2
Fig. 11.4-1 Stripping GPS Cable
11-3
Fig. 11.4-2 Welding GPS Connector Pin
11-3
Fig. 11.4-3 Structure of the N-J7A Cable Connection Part
11-3
Fig. 12.3-1 Board Mechanical Structure
12-5
Fig. 12.3-2 Picture of a Board................................................................................................. 12-6
Fig. 12.3-3 Loosening the Screws and Unplugging the RFE
12-7
Fig. 12.4-1 BIM Interface Board Structure............................................................................. 12-8
Fig. 12.4-2 Structure of a Back Interface Board
12-10
Fig. 12.5-1 Positions of Boards ............................................................................................ 12-11
Fig. 13.14-1 Waterproof Outdoor 1/2” Jumper
13-11
Fig. 13.15-1 Antenna Installation Checking the Feeder SWR
13-14
Fig. B.5-1 SWR Test for the Antenna Feeder
B-3
Fig. B.6-1 Antenna Feeder DTF Measurement
B-4
Fig. C.1-1 Indicators on the RMM
C-1
Содержание ZXC10 BTSB I1
Страница 4: ......
Страница 16: ......
Страница 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Страница 76: ......
Страница 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Страница 96: ......
Страница 106: ......
Страница 114: ......
Страница 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Страница 158: ......
Страница 174: ......
Страница 180: ......
Страница 186: ...ZXC10 BTSB V1 0 cdma2000 Base Transceiver Station Installation Manual B 4 Fig B 6 1 Antenna Feeder DTF Measurement ...