ZXC10 BTSB (V1.0) cdma2000 Base Transceiver Station Installation Manual
4-14
1
2
4
3
5
6
7
1. Pressure plate 2. M10 × 25 bolts 3 Washer 4. Insulation pad 5. Cabinet support 6. Retaining nut 7. Base
Fig. 4.2-13 Fixation of Supports, Pressure Plate and Base
4.2.3.5 Testing Insulation
Connect the cabinet to the floor. The test is passed if electricity cannot be conducted
through the connection.
4.2.4 Cabinet Stacking Mode
BDS and PWS are put on RFS.
4.2.4.1 Installing the BDS Unit
On the front cover, screw five M5 bolts inside RFS through the holes on the top of
cabinet to the nut inside the BDS unit. On the back cover, fix the BDS unit to the RFS
cabinet by screwing nine screws with the edge iron, as shown in Fig. 4.2-14.
Содержание ZXC10 BTSB I1
Страница 4: ......
Страница 16: ......
Страница 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Страница 76: ......
Страница 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Страница 96: ......
Страница 106: ......
Страница 114: ......
Страница 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Страница 158: ......
Страница 174: ......
Страница 180: ......
Страница 186: ...ZXC10 BTSB V1 0 cdma2000 Base Transceiver Station Installation Manual B 4 Fig B 6 1 Antenna Feeder DTF Measurement ...