Chapter 11 GPS Antenna Feeder System Installation
11-3
The GPS coaxial cable is peeled according to the dimensions shown in Fig.
11.4-1.
6.2
16.7
Fig. 11.4-1 Stripping GPS Cable
2. Welding
core
Before welding the core wire, thread the parts with the cable in the sequence as
shown in Fig. 11.4-2. Then, weld the cable core with the pin. The shielding layer
of the cable should be opened and covered on the bush.
Pin
Insulating
gasket
Cable
shielding
Jacket
Crimp
jacket
Nut
Cable
Core wire
Tin
soldering
Fig. 11.4-2 Welding GPS Connector Pin
3. Installing
parts
After welding the core, install the parts on the case. The structure of the cable
assembly is shown in Fig. 11.4-3.
Insulating
gasket
Jacket
Crimp
jacket
Shell
Nut
Pin
Fig. 11.4-3 Structure of the N-J7A Cable Connection Part
Содержание ZXC10 BTSB I1
Страница 4: ......
Страница 16: ......
Страница 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Страница 76: ......
Страница 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Страница 96: ......
Страница 106: ......
Страница 114: ......
Страница 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Страница 158: ......
Страница 174: ......
Страница 180: ......
Страница 186: ...ZXC10 BTSB V1 0 cdma2000 Base Transceiver Station Installation Manual B 4 Fig B 6 1 Antenna Feeder DTF Measurement ...