
INSTALLER SIGNATURE Date
System Check
Yes/No
Notes
General Layout
General condition - components level, even, straight, etc?
System layout conforms to your established standard?
Clearance check - Vehicle Mount to 2010 Hand Held?
Drilling and Cutting
All drill holes grommeted (or otherwise protected), deburred,
sealed (weather penetrations only)
All chips captured?
Vehicle Mount vacuumed and visually verified to be free of
drill chips or other debris?
Cable Management
All cables properly ran (no tight radius, no interference, strain
relieved, supported, service looped)?
Electrical
System hookup complies to your established standard?
Red lead voltage verified? (12V constant)
White lead voltage verified? Engine on-12V, engine off-OV,
key-accessory position with engine off-OV
Black lead continuity verified? (Grounded to vehicle chassis)
Verify crimp integrity?
Verify fuse holder and fuse installation?
GPS/J3 System checkout
GPS/J3 LED light check? (engine on/engine off) (key in
accessory position)
Verify GPS position uploaded to GTC website?*
EVIR
®
System checkout
Asset tag verification scan
Zone tag verification scan? (2010 display = physical location)
Inspection properly uploaded to GTC?
Post Job
Key accounted for?
Vehicle secure?
Lights, electrical off?
All debris, refuse, chips removed?
Customer:
Yard:
Date:
Asset #:
Installer:
Location:
GPS ID:
Vehicle Odometer Value:
Vehicle I.D. (e.g., Vin, Plate#, Make, Model, Year
Vehicle Hour Meter value (if monitoring engine hours)
17
V3 SYSTEM CHECKLIST
*For 4 Pin or OBDII installed vehicles:
Requires vehicle to physically
move at least 5 MPH for at least 100 feet to properly complete new
install checkout. If this is not performed GPS and discrete IO data will
not be present in GTC until those thresholds are met
Содержание V3
Страница 1: ...REV 07 31 12 ...
Страница 27: ...NOTES 27 ...
Страница 28: ... 2012 Zonar Systems All Rights Reserved REV 07 31 12 V3 USERS MANUAL AND INSTALLATION GUIDE ...