
Unpacking Procedures Warning
15
Zolix Instruments Co., Ltd.
http://www.zolix.com.cn E-mail:[email protected]
8. Unpacking Procedures
(
1
)
Visual examination
Please do the following inspection for all packing box
Check whether the packaging is intact outside the equipment, there are
situations, such as damage, soaks, out of shape, etc..
Have above-mentioned situation please report immediately to Zolix or
representatives
(
2
)
Unpacking procedures
Please open the packing box and make sure not to use heavy-duty tools or
opens roughly. With the proper tool according to the direction shown on the
packing box so as not to cause inside equipment to be damaged.
(
3
)
After unpacking
Please check equipment appearance for damage or corrosion, etc..
Based on contract and packing list, check specification, mode, and quantity.
Have above-mentioned situation please report immediately to Zolix or
representatives
Please keep the packing box for at least 6 months in order to return or for
transportation.
9. Warning
Warning!!!
Never open the case when it is in operation!