RECOMMENDED INSTALLATION FOR ALL APPLICATIONS

  (1)   Electrical wiring and protection must be in accordance with 

National Electrical Code and any other applicable state and 

local electrical requirements. 

  (2)   Install proper Zoeller Unicheck (combination union and check 

valve) preferably just above the basin to allow easy removal of 

the pump for cleaning or repair. See (4) below. 

  (3)   All installations require a basin cover to prevent debris from 

falling into the basin and to prevent accidental injury. 

  (4)   When a Unicheck is installed, drill a 

3

/

16

" (5 mm) dia. hole in 

the discharge pipe even with the top of the pump. 

NOTE: THE 

HOLE MUST ALSO BE BELOW THE BASIN COVER AND 

CLEANED PERIODICALLY. 

Water stream will be visible from 

this hole during pump run periods.

  (5)   Securely tape or clamp power cord to discharge pipe, clear of 

the float mechanism(s). 

  (6)  Use full-size discharge pipe. 
 (7)  Basin must be in accordance with applicable codes and  

specifications.

  (8)   Pump must be level and float mechanism(s) clear of sides of 

basin before starting pump.     

  (9)  Basin must be clean and free of debris after installation.
 (10)   Gate valve or ball valve to be supplied by installer and installed  

according to any and all codes.

 (11)  Gas tight seals required to contain gases and odors.
 (12)    Vent gases and odors to the atmosphere through vent pipe 

(sewage and dewatering only).

 (13)    Install a Zoeller pump stand  (10-2421) under pump to provide a  

  settling basin (dewatering only).

TYPICAL DEWATERING INSTALLATION

SK292

TURN

ON

TURN

OFF

1

2

3

7

9

14

8

6

4

5

10

12

13

4” (10 cm) OF GRAVEL

    MINIMUM

(457 mm X 610 mm)

 18"x24" BASIN

 LARGER DEPTHS
    MAY BE 
   REQUIRED.

MAIL TO:  P.O. BOX 16347 • Louisville, KY  40256-0347

SHIP TO:  3649 Cane Run Road • Louisville, KY  40211-1961

(502) 778-2731 • 1 (800) 928-PUMP • FAX (502) 774-3624

Visit our web site:

zoellerpumps.com

See FM0531, FM0732 and FM1420 for 

alarms, controls and junction boxes.

All installations must comply with all applicable electrical and plumbing codes, including,  but not limited to, National Electrical Code, local, regional, and/or state plumbing 

codes, etc. Not intended for use in hazardous locations.

These are the original installation instructions.

Содержание 63

Страница 1: ...nces Three phase pumps require motor starting devices with motor overload protection See FM0486 for duplex installations 7 Risk of electric shock Do not remove power supply cord and strain relief or connect conduit directly to the pump 8 Installationandservicingofelectricalcircuitsandhardwareshouldbeperformed by a qualified licensed electrician 9 Pump installation and servicing should be performed...

Страница 2: ... an alleged pump failure the Homeowner must retain possession of the pump for investigation purposes LED light up plug may dim or extinguish after approximately 5 years This does not mean the pump has failed Although the LED light up plug is attached to the pump the LED light works independently from the pump If this happens visually inspect the pump to verify it is working properly This occurrenc...

Страница 3: ...rdous liquids 8 DO test pump immediately after installation to be sure that the system is working properly 9 DO cover sump with an adequate sump cover 10 DOreviewallapplicablelocalandnationalcodesandverifythattheinstallation conforms to each of them 11 DO consult manufacturer for clarifications or questions 12 DO consideratwopumpsystemwithanalarmwhereaninstallationmaybecome overloaded or primary p...

Страница 4: ...8 Pump must be level and float mechanism s clear of sides of basin before starting pump 9 Basin must be clean and free of debris after installation 10 Gate valve or ball valve to be supplied by installer and installed according to any and all codes 11 Gas tight seals required to contain gases and odors 12 Vent gases and odors to the atmosphere through vent pipe sewage and dewatering only 13 Instal...

Страница 5: ...vijasdebeinsertarseenelrespectivoreceptáculode3clavijas puesto a tierra Si la instalación no tiene un receptáculo de este tipo debe cambiarlo por el adecuado cablearlo y ponerlo a tierra conforme al Código Eléctrico Nacional y todos los códigos y disposiciones locales pertinentes Todas las bombas trifásicas requieren dispositivos de arranque del motor con protección contra sobrecarga Vea FM0486 pa...

Страница 6: ...ión del Fabricante que haya sido expuesto a sustancias foráneas que incluyen pero no se limitan a lo siguiente arena grava cemento lodo alquitrán hidrocarburos derivados de hidrocarburos aceite gasolina solventes etc u otras sustancias abrasivas o corrosivas toallas para lavar o productos sanitarios femeninos etc en todas las aplicaciones de bombeo La garantía presentada en el párrafo anterior dej...

Страница 7: ...endedor si la sistema está dañada 3 RETIRE todos los escombros del sumidero Asegúrese de que la bomba se apoyará sobre una superficie dura plana y estable NO LA INSTALE sobre arena grava o tierra 4 ASEGÚRESE de que la área sea suficientemente grande para permitir el funcionamiento correcto de los interruptores de control de nivel 5 SIEMPRE desconecte la bomba de la fuente de alimentación eléctrica...

Страница 8: ... Para arrancar la bomba esta debe estar nivelada y el los mecanismo s de flotación lejos de los lados del contenedor para agua 9 Después de la instalación el contenedor para agua debe quedar limpio y sin residuos 10 La válvula de paso o la válvula de bola deben ser suministradas por el instalador e instaladas de acuerdo con todos los códigos 11 Se requieren sellos estancos al gas que retengan los ...

Страница 9: ...a fiche à 3 broches doit être insérée dans une prise à 3 broches mise à la terre Si l installation ne comprend pas de prise il faut la changer pour le type approprié la câbler et la mettre à la terre en conformité avec le code national de l électricité ainsi que tous les codes et règlements locaux applicables Les pompes triphasées nécessitent des dispositifs de démarrage avec une protection de sur...

Страница 10: ...tent pas les limitations de la durée de la garantie implicite et il est possible que cette limitation ne s applique pas Certaines provinces ne permettent pas l exclusion ou la limitation des dégâts secondaires ou indirects et il est possible que cette limitation ou exclusion ne s applique pas Cette garantie vous donne des droits spécifiques reconnus par la loi et vous pouvez également avoir d autr...

Страница 11: ...es uniquement F Perte de pression et ou réduction de la capacité après une période d utilisation Un frottement augmenté du tuyau une ligne ou un clapet antiretour obstrués Les matériaux abrasifs et les produits chimiques nocifs peuvent endommager l impulseur et le boîtier de la pompe Vérifier la ligne Retirer la base et vérifier 1 IL FAUT lire toutes les instructions d installation fournies avec l...

Страница 12: ...lementation en vigueur 8 La pompe doit être à niveau et le s mécanisme s du flotteur ne doit vent pas toucher les côtés de la cuve avant le démarrage de la pompe 9 Après installation la cuve doit être propre et exempte de tout débris 10 La vanne ou le clapet à bille doivent être fournis par l installateur et installés conformément à tous les codes en vigueur 11 Des joints étanches aux gaz sont néc...

Отзывы: