
13
1.4 Commissioning
1.4.1 Starting the appliance
power on the appliance (by switching on the general terminal board),
only for three-phased Sirocco: when the dehumidifier is switched on, check the status of the phase
controller (
KA4
). If it is off, cut off the power supply and invert two phases
directly
on the appliance
connection terminal board.
This operation must be only be carried out by a qualified professional.
set the humidity and temperature on the Hygro Control so that it triggers dehumidifying and / or air
heating (optional), see §1.3.7.5.
1.4.2 Checks
In the Hygro Control comfort model (see §1.3.7.5)
check that hot air is coming out of the blower grates,
check that the appliance is draining condensation,
1.4.3 Commissioning the options
The heating options are operational from 4°C surrounding air temperature.
1.4.3.1 Extra heating
starting up Hygro Control and adjust the thermostat to between 26 and 28°C (maximum 30°C), in
general choose an air temperature 1 to 2°C higher than the pool water temperature,
check that with the “VI/VP” switch on “VI”, and no dehumidification or defrosting cycles in progress:
- the fan stops operating, after post-ventilation of 3 minutes when the reference room temperature
on the pool room thermostat is lowered,
- in the event of abnormal overheating, the appliance shuts down the heating option automatically,
by shutting off the heating elements and keeping the ventilation operational (for as long as a
heating request is active).
This safety device has two levels of triggering:
1) by “THS” safety thermostat if the T°C is > 65°C (it is automatically
reset),
2) if the temperature continues to increase, the second positive
“THSM” safety thermostat
puts the appliance into safety mode.
=> reset it manually (with power off), after having checked that the
appliance air flow is correct (with the “VI/VP” switch on “VP”), that
the grates are not obstructed, that the filter is not clogged, and the
fan is not defective.
1.4.3.2 Hot water battery
supply the battery with hot water at 45 °C minimum from the heat source (boiler, heat pump,
geothermal energy, solar heating), installation must be carried out by a qualified technician, using a
circulator (not supplied) which will be powered by terminals C-C on the electrical terminal board.
Insulate the hot water battery hot water pipes between the heat source and the appliance
(for the purpose of limiting calorie loss).
if your pool has a cover (shutter or bubble sheet type, etc.), you can lower the room
temperature when it is in place (by adjusting the thermostat to about 20°C) and raise the
pool hall temperature before removing the cover.
When the “ECP 600” regulator is switched on ventilation is active for 5 minutes.
This also occurs if the appliance is powered on and the “on/off” switch of the
Hygro Control delivered with the appliance is used.
This phase order controller protects the compressor.
It’s
forbidden
to
inverted phases:
- on the power contactor (KM2)
- on the compressor
If the indicator remains switched off after this operation check for the presence of the
three phases on the phase order controller KA4.
EN
Содержание SIROCCO 110
Страница 21: ...N o t e s N o t e n A a n t e k e n i n g N o t a s N o t a...
Страница 22: ...1 Electric diagram Sirocco 55 80 110 single phase...
Страница 23: ...2 Sirocco 110 three phase...
Страница 26: ...N o t e s N o t e n A a n t e k e n i n g N o t a s N o t a...
Страница 27: ...N o t e s N o t e n A a n t e k e n i n g N o t a s N o t a...