H03620
‐
00.B5.EN
–
2011/11
9
ensure
no
foreign
bodies
obstruct
the
fan
grid.
clean
the
evaporator
with
a
soft
brush
and
a
fresh
water
jet
(disconnect
the
power
cable),
do
not
twist
or
bend
the
metal
blades,
then
to
clean
the
discharge
pipe
of
the
condensates
in
order
to
evacuate
the
impurities
which
could
block
it,
clean
the
outside
of
the
unit
with
a
solvent
‐
free
product.
A
specific
PAC
NET
cleaning
kit
is
available
as
an
optional
extra
(see
§4.3),
check
that
the
water
condensation
flows
out
properly
during
the
operation
of
the
device.
check
the
proper
operation
of
the
regulator,
check
electrical
components,
check
that
all
metal
elements
are
grounded,
check
the
tightening
and
connections
of
electric
cables
and
the
cleanliness
of
the
electrical
compartment.
4.2
Additional
recommendations
in
relation
to
the
Pressure
Equipment
Directive
(PED
‐
97/23/CE)
4.2.1
Installation
and
maintenance
the
unit
may
not
be
installed
close
to
combustible
materials,
or
the
air
duct
inlet
of
an
adjacent
building
.
with
some
devices,
it
is
essential
to
fit
protection
grids
if
the
unit
is
installed
in
an
area
with
uncontrolled
access.
during
installation,
troubleshooting
and
maintenance,
pipes
may
not
be
used
as
steps:
the
pipe
could
break
under
the
weight,
spilling
refrigerant
and
possibly
causing
serious
burns.
when
servicing
the
appliance,
the
composition
and
state
of
heat
carrying
fluid
must
be
checked,
as
well
as
the
absence
of
any
refrigerant.
during
the
annual
unit
sealing
test
in
accordance
with
applicable
legislation,
the
high
and
low
pressure
switches
must
be
checked
to
ensure
that
they
are
securely
fastened
to
the
coolant
circuit
and
that
they
cutoff
the
electrical
circuit
when
tripped.
during
maintenance
work,
ensure
there
are
no
traces
of
corrosion
or
oil
around
cooling
components.
before
beginning
work
on
the
cooling
circuit,
stop
the
device
and
wait
for
a
few
minutes
before
fitting
the
temperature
and
pressure
sensors.
Some
elements
such
as
the
compressor
and
piping
may
reach
temperatures
in
excess
of
100°C
and
high
pressures
with
the
consequent
risk
of
severe
scalding.
4.2.2
Troubleshooting
all
soldering
work
must
be
carried
out
by
a
someone
qualified
to
do
so.
replacement
pipes
must
always
be
made
of
copper
in
compliance
with
standard
NF
EN
12735
‐
1.
leak
detection;
pressure
test:
-
never
use
oxygen
or
dry
air,
risk
of
fire
or
explosion,
-
use
dry
nitrogen
or
the
mixture
of
nitrogen
and
refrigerant
indicated
on
the
information
plate,
-
the
test
pressure
for
both
the
high
and
low
pressure
circuits
must
not
exceed
42
bar.
the
high
pressure
circuit
pipes
are
made
of
copper
and
have
a
diameter
equal
to
or
greater
than
1’’5/8.
A
certificate
as
indicated
in
§2.1
in
compliance
with
standard
NF
EN
10204
will
be
requested
from
the
supplier
and
filed
in
installation
technical
documentation.
technical
data
relative
to
the
safety
requirements
of
the
various
applicable
directives
must
be
indicated
on
the
information
plate.
This
data
must
be
recorded
in
the
installation
instructions
for
the
device
which
are
included
in
the
installation
technical
file
:
model,
code,
serial
number,
maximum
and
minimum
OT,
OP,
year
of
manufacture,
EC
label,
manufacturer’s
address,
refrigerant
and
weight,
electrical
parameters,
thermo
‐
dynamic
and
acoustic
performances.
4.3
Available
accessories
Name
PAC
NET
Wintering
cover
Representation
Item
code
WMA03491
W20HOUSSEPFIRST
Содержание PF Premium 6M
Страница 15: ...Notes ...
Страница 16: ...H03620 00 B5 EN 2011 11 1 Wiring diagram PFP 6M 8M 11M 13M ...
Страница 17: ...H03620 00 B5 EN 2011 11 2 PFP 11T ...
Страница 18: ...H03620 00 B5 EN 2011 11 3 PFP 11M TSR 15M TSR ...
Страница 19: ...H03620 00 B5 EN 2011 11 4 PFP 11T TSR 15T TSR ...