ZNSHINE  SOLAR  recommends  using  lightning  protection  devices  which  are  complied  with  local  laws  and 

electrical regulations. 

All the above instructions must be followed to meet ZNSHINE SOLAR warranty conditions. 

3

Bypass secondary 

If PV module part by shadow block, which can lead to reverse voltage related to solar cells, PV modules in 

other unaffected battery string or other PV modules in the system and current will force through keep out part of 
the power loss and heat affected cell. When the PV module is connected in parallel with the bypass diode, the 
current in the system will flow directly through the diode, so as to bypass the blocked part of the PV module and 
minimize the heating degree and power consumption of the PV module. 

Each module has three diodes. Please do not try to open the junction box to replace the diode, or even when 

the diode problem, please do this work by professionals. 

4

Grounding 

All PV module frames and mounting brackets must be properly grounded in accordance with the applicable 

national electrical code. 

Correct  grounding  is  achieved  by  continuously  connecting  the  PV  module  frame  and  all  metal  modules 

together  using  the  appropriate  grounding  conductor.  The  grounding  wire  may  be  copper,  copper  alloy  or  other 
materials  that  can  be  used  as  conductors  and  meet  the  requirements  of  the  national  electrical  code.  It  is 
recommended  to  use  the  copper wire  (4-14mm

2

  or  AWG  6-12)  as  the  grounding  wire. The  signal” 

 ” can  be 

found  at  the  grounding  hole  position.  The  ground  wire  must  also  be  connected  to  ground  through  a  suitable 
ground electrode. The tight connection of all the joint point should be ensured. 

On a grounding hole with a diameter of φ4 mm, use a separate grounding wire and related accessories to 

connect the aluminum frame of the solar PV module and connect the grounding wire to the ground. The grounding 
uses the M4*12mm bolts and M4 nuts, star washers and plain washers, this ensures that the modules are firmly 
grounded.  You  can  find  the  corresponding  product  drawing  in  module  datasheet  to  know  the  detailed  number, 
size and position of the grounding holes. The torque applied to ground fixation is 4N·m

8N·m. 

 

When grounding, each module can be grounded directly or in series or in parallel. If you choose the latter two 

options, it is recommended that the maximum number of modules connected in parallel should not exceed four, 
and in series should not exceed eight. 

In addition to use the grounding hole, you can also choose the following grounding ways: 

1

Grounding by unused mounting holes 

2

Other professional grounding devices 

The  electrical  contact  points  of  all the  above  grounding methods should  penetrate  the  anodized  film of the 

aluminum frame. PV modules can be grounded by other grounding devices, which must be reliable and certified. 
The manufacturer's requirements should be followed. 

 

 

Содержание ZXM6-LD60-280/M

Страница 1: ...S INSTALLATION MANUAL Double glass Bifacial double glass Modules ZNSHINE PV TECH CO LTD No 1 South Zhenxing Road Zhixi Town Industry Concentration Zone Jintan Zone Changzhou Jiangsu Province China Tel...

Страница 2: ...ZX RD III032A DOCUMENT COUNTERSIGN DEPARTMENT Product Technology Department Quality Department Marketing Center COUNTERSIGNER DOCUMENT NO QES ZX RD 032A COMPILER EDITION A REVIEWER EFFECTIVE DATE 2020...

Страница 3: ...STORAGE 7 4 UNPACKING SAFETY 7 5 INSTALLATION 8 5 1 INSTALLATION SAFETY 8 5 2 ENVIRONMENT CONDITIONS AND SITE SELECTION 9 5 3 TILT ANGLE OF INSTALLATION 10 5 4 INSTALLATION REQUIREMENTS FOR BIFACIAL...

Страница 4: ...ions and suggestions Do not constitute a warranty expresses or implied 1 2 LIMITATION OF LIABILITY ZNSHINE SOLAR is not responsible for any form of damage including but not limited to module operation...

Страница 5: ...on the module directly 2 Do not damage or scratch the front or backside surfaces of the module 3 Do not drag Scratch bend the output cable with force or with too tight connection The insulation of out...

Страница 6: ...by two or more persons at the same time 5 Handling the modules requires two or more people with nonslip gloves and both hands 6 Do not lift modules by their wires or junction box 7 Do not handle the m...

Страница 7: ...e 3 1 3 Modules in carton are fragile which must be handled with care 3 1 4 The packaging must be transported upright 3 1 5 Do not step on the package and module 3 1 6 Modules shall be stacked as requ...

Страница 8: ...ropes are strong and firm Two people shall support at the two sides of the righting carton gently to place it on the relatively flat position of the project site 3 2 2 Use a forklift to remove the mo...

Страница 9: ...ea or air During transportation make sure that the package is fixed securely to the shipping platform without movement Do not Stack more than two layers on truck 3 3 3 Only one layer stacking is only...

Страница 10: ...npacking outdoors it is prohibited to operate in rainy conditions Because the carton will become soft and damaged after it gets wet in the rain The stacked PV modules hereinafter referred to as module...

Страница 11: ...he connector if the system circuit is connected to a load 11 Do not stand on the module glass There is a risk of injury or electric shock if glass is broken 12 Do not work alone always work as a team...

Страница 12: ...lowest position on the horizon in winter The shadow will cause the loss of the output power of the solar photovoltaic system Although the bypass diode installed in the PV module can reduce this loss t...

Страница 13: ...rantee enough power output during the winter it will make the whole solar PV system in the rest of the year can have enough power output also PV modules are recommended to be installed at an optimized...

Страница 14: ...gain it is recommended to install the module at a height from 0 5m to 2m See Fig 5 2 Fig 5 2 Distance from the earth In the system design besides the ground type and the module installation height to...

Страница 15: ...ss steel gaskets with a minimum thickness of 1 5mm and an external diameter of 16 20mm shall be used in all parts of the components connected to the Single axis tracking system The installation method...

Страница 16: ...consulted by ZNSHINE SOLAR B Mounting with Single axis Tracking System with 4 7 10mm mounting holes Modules can be attached through the mounting holes 4 7 10mm on the back of the module frame by fixin...

Страница 17: ...e Mechanical Load Pressure Safety factor Mounting Direction 60 66 72 120 132 144 pcs double glass 60 66 72 120 132 144 pcs bifacial double glass 1600Pa 1600Pa 1 5 NOTE The above described distance is...

Страница 18: ...in the table below Figure 5 5 Mounting holes schematic of the single module for the 2V installation method Module Mechanical Load Pressure Safety factor Mounting Direction 60 66 72 120 132 144 pcs dou...

Страница 19: ...each module two clamps should be attached on each long sides of the module for portrait orientation Depending on local wind and snow loads additional clamps may be required to ensure that modules can...

Страница 20: ...o make sure the Mechanical load 4 The load is an empirical value of a standard module based on a standard installation mode and the specific information shall be consulted by ZNSHINE SOLAR 60 66 72 12...

Страница 21: ...mounting method use at least four clamps on each module the 4 clamps should be attached two each on the long sides of the module Depending on local wind and snow loads additional clamps may be require...

Страница 22: ...gth 72 144 pcs frameless bifacial double glass 1600Pa 1600Pa 1 5 150mm A 1 4L 50mm L Module length NOTE The above described distances are from the module edge to the middle of the clamp Need two or mo...

Страница 23: ...V modules Insert the PV module into the clamp and make sure the module edge touch to the EPDM closely and then tighten the nut with uniform torque values using a q qualified torque wrench Ensure the m...

Страница 24: ...J Box are as follows The extension cable is required Fig 1 Split J Box at module side position for vertical direction Fig 2 Split J Box at module middle position for vertical direction Fig 3 Split J B...

Страница 25: ...he following formula Table 5 4 maximum series connection number calculation Formula Maximum system voltage V N Voc 1 Tmin 25 V Maximum system voltage N The number of maximum solar PV modules in series...

Страница 26: ...e calculated by the following formula Minimum current carrying capacity of the cable 1 25 Isc Np Isc short circuit current of PV module unit A Np the number of modules in parallel or module strings If...

Страница 27: ...and meet the requirements of the national electrical code It is recommended to use the copper wire 4 14mm2 or AWG 6 12 as the grounding wire The signal can be found at the grounding hole position The...

Страница 28: ...igh voltages this is dangerous Please pay attention to safety when maintenance and it must be done by professionals Wear cut resistant gloves and other personal protective equipment required for the p...

Страница 29: ...se a soft cloth together with a mild detergent and clean water Take care to avoid severe thermal shocks which might damage the module by cleaning modules with water which has a similar temperature to...

Страница 30: ...urface or not 5 Check whether the module support structure is leaning or bent or not 6 Check whether the connectors of the module are detached or not 7 After cleaning fill out the PV module cleaning r...

Страница 31: ...FICATION FOR SOLAR MODULE BARCODE Example PMC placed the order for the second time in one day the 3rd workshop produced a batch of 5BB mono with coating PV modules And the 3rd workshop started product...

Страница 32: ...ZXM6 LD60 330 M 330 33 6 9 83 40 8 10 35 1678 1002 30 22 Si Mono 158 75 158 75 20 1500 Class A ZXM6 LD72 380 M 380 39 8 9 55 48 5 10 07 2000 1002 30 26 Si Mono 158 75 158 75 20 1500 Class A ZXM6 LD72...

Страница 33: ...91 49 4 13 65 2256 1133 35 33 5 Si Mono 182 91 25 1500 Class A ZXM7 SPLDD144 535 M 535 41 3 12 96 49 6 13 71 2256 1133 35 33 5 Si Mono 182 91 25 1500 Class A ZXM7 SPLDD144 540 M 540 41 5 13 02 49 8 13...

Страница 34: ...www znshinesolar com Document No QES ZX RD III032A 31 9 Modify record Revision Date Version No Revisioner Remarks modifications chapters etc New 2020 10 13 A Full text of Installation Manual...

Отзывы: