CLEANING 

Dust accumulation on the glass surface of the module will reduce its power output and may cause hot spots. 

So  the  surface  of  PV  modules  should  be  kept  clean.  Maintenance  work  should  be  performed  at  least  once  six 
months or frequently. 

Warning: It should be carried out by trained personnel. Workers should wear PPE, such as goggles, electric 

insulation gloves and safety shoes. The gloves should withstand DC voltages of no less than 2000V. 

Use dry or wet soft cloths, sponges, etc. to clean the modules during the cleaning process, but do not put any 

modules directly into the water, do not use corrosive solvents and do not wipe the PV modules with hard objects. 
When the pressure water is used, the water pressure on the glass surface of the module must not exceed 700 
KPa. The module must not be subjected to additional external force. If there is greasy dirt and other substances 
on the surface of the PV module which are difficult to clean, conventional household glass cleaning agents can be 
used; Do not use the alkaline and strong acid solvents. If necessary, use isopropyl alcohol (IPA) or other solution 
according to the safety instructions to clean and ensure that no solution flows into the gap between the edge of 
the module and the module frame. 

Clean  PV  modules  when  the  irradiance  is  below  200W/m2.  When  cleaning  the  modules,  use  a  soft  cloth 

together with a mild detergent and clean water. Take care to avoid severe thermal shocks which might damage 
the module by cleaning modules with water which has a similar temperature to the modules being cleaned. For 
example, do not use cold water to clean the module when the temperature of it is high during the day, otherwise 
there will be the risk of module damage. 

It is forbidden to clean PV modules under the weather conditions of wind more than 4 grades, heavy rain or 

heavy snow. 

When cleaning PV modules, Do not step on the modules; Do not spray water on the backside of the module 

or the cables; keep the connectors clean and dry; prevent fire and electrical shock from occurring; Do not use as 
steam cleaner. 

The  back  surface  of  the  module  normally  does  not  need  to  be  cleaned  but,  in  the  event  this  is  deemed 

necessary, avoid the use of any sharp projects that might damage the penetrating the substrate material. 

When  cleaning  the  back  surface  of  the  module,  take  care  to  avoid  penetrating  the  substrate  material. 

Modules  that  are  mounted  flat  (0°  tilt  angle)  should  be  cleaned  more  often,  as  they  will  NOT  ''self-clean''  as 
effectively as modules mounted at a 10° tilt or greater. 

Do not scrape or grind stains off surfaces while PV modules are dry, as this can cause minor scratches on 

the surface. 

Water requirements when cleaning: 

1

PH: 5

7

 

2

Chloride or salt content: 0 - 3000 mg/L 

3

Turbidity: 0-30 NTU 

4

Conductivity: 1500

3000 μs/cm 

5

Total dissolved solids: 

1000 mg/L 

6

Water hardness: 0-40 mg/L 

7

Non-alkaline water must be used, and softened water can be used when conditions permitted. 

 

 

Содержание ZXM6-LD60-280/M

Страница 1: ...S INSTALLATION MANUAL Double glass Bifacial double glass Modules ZNSHINE PV TECH CO LTD No 1 South Zhenxing Road Zhixi Town Industry Concentration Zone Jintan Zone Changzhou Jiangsu Province China Tel...

Страница 2: ...ZX RD III032A DOCUMENT COUNTERSIGN DEPARTMENT Product Technology Department Quality Department Marketing Center COUNTERSIGNER DOCUMENT NO QES ZX RD 032A COMPILER EDITION A REVIEWER EFFECTIVE DATE 2020...

Страница 3: ...STORAGE 7 4 UNPACKING SAFETY 7 5 INSTALLATION 8 5 1 INSTALLATION SAFETY 8 5 2 ENVIRONMENT CONDITIONS AND SITE SELECTION 9 5 3 TILT ANGLE OF INSTALLATION 10 5 4 INSTALLATION REQUIREMENTS FOR BIFACIAL...

Страница 4: ...ions and suggestions Do not constitute a warranty expresses or implied 1 2 LIMITATION OF LIABILITY ZNSHINE SOLAR is not responsible for any form of damage including but not limited to module operation...

Страница 5: ...on the module directly 2 Do not damage or scratch the front or backside surfaces of the module 3 Do not drag Scratch bend the output cable with force or with too tight connection The insulation of out...

Страница 6: ...by two or more persons at the same time 5 Handling the modules requires two or more people with nonslip gloves and both hands 6 Do not lift modules by their wires or junction box 7 Do not handle the m...

Страница 7: ...e 3 1 3 Modules in carton are fragile which must be handled with care 3 1 4 The packaging must be transported upright 3 1 5 Do not step on the package and module 3 1 6 Modules shall be stacked as requ...

Страница 8: ...ropes are strong and firm Two people shall support at the two sides of the righting carton gently to place it on the relatively flat position of the project site 3 2 2 Use a forklift to remove the mo...

Страница 9: ...ea or air During transportation make sure that the package is fixed securely to the shipping platform without movement Do not Stack more than two layers on truck 3 3 3 Only one layer stacking is only...

Страница 10: ...npacking outdoors it is prohibited to operate in rainy conditions Because the carton will become soft and damaged after it gets wet in the rain The stacked PV modules hereinafter referred to as module...

Страница 11: ...he connector if the system circuit is connected to a load 11 Do not stand on the module glass There is a risk of injury or electric shock if glass is broken 12 Do not work alone always work as a team...

Страница 12: ...lowest position on the horizon in winter The shadow will cause the loss of the output power of the solar photovoltaic system Although the bypass diode installed in the PV module can reduce this loss t...

Страница 13: ...rantee enough power output during the winter it will make the whole solar PV system in the rest of the year can have enough power output also PV modules are recommended to be installed at an optimized...

Страница 14: ...gain it is recommended to install the module at a height from 0 5m to 2m See Fig 5 2 Fig 5 2 Distance from the earth In the system design besides the ground type and the module installation height to...

Страница 15: ...ss steel gaskets with a minimum thickness of 1 5mm and an external diameter of 16 20mm shall be used in all parts of the components connected to the Single axis tracking system The installation method...

Страница 16: ...consulted by ZNSHINE SOLAR B Mounting with Single axis Tracking System with 4 7 10mm mounting holes Modules can be attached through the mounting holes 4 7 10mm on the back of the module frame by fixin...

Страница 17: ...e Mechanical Load Pressure Safety factor Mounting Direction 60 66 72 120 132 144 pcs double glass 60 66 72 120 132 144 pcs bifacial double glass 1600Pa 1600Pa 1 5 NOTE The above described distance is...

Страница 18: ...in the table below Figure 5 5 Mounting holes schematic of the single module for the 2V installation method Module Mechanical Load Pressure Safety factor Mounting Direction 60 66 72 120 132 144 pcs dou...

Страница 19: ...each module two clamps should be attached on each long sides of the module for portrait orientation Depending on local wind and snow loads additional clamps may be required to ensure that modules can...

Страница 20: ...o make sure the Mechanical load 4 The load is an empirical value of a standard module based on a standard installation mode and the specific information shall be consulted by ZNSHINE SOLAR 60 66 72 12...

Страница 21: ...mounting method use at least four clamps on each module the 4 clamps should be attached two each on the long sides of the module Depending on local wind and snow loads additional clamps may be require...

Страница 22: ...gth 72 144 pcs frameless bifacial double glass 1600Pa 1600Pa 1 5 150mm A 1 4L 50mm L Module length NOTE The above described distances are from the module edge to the middle of the clamp Need two or mo...

Страница 23: ...V modules Insert the PV module into the clamp and make sure the module edge touch to the EPDM closely and then tighten the nut with uniform torque values using a q qualified torque wrench Ensure the m...

Страница 24: ...J Box are as follows The extension cable is required Fig 1 Split J Box at module side position for vertical direction Fig 2 Split J Box at module middle position for vertical direction Fig 3 Split J B...

Страница 25: ...he following formula Table 5 4 maximum series connection number calculation Formula Maximum system voltage V N Voc 1 Tmin 25 V Maximum system voltage N The number of maximum solar PV modules in series...

Страница 26: ...e calculated by the following formula Minimum current carrying capacity of the cable 1 25 Isc Np Isc short circuit current of PV module unit A Np the number of modules in parallel or module strings If...

Страница 27: ...and meet the requirements of the national electrical code It is recommended to use the copper wire 4 14mm2 or AWG 6 12 as the grounding wire The signal can be found at the grounding hole position The...

Страница 28: ...igh voltages this is dangerous Please pay attention to safety when maintenance and it must be done by professionals Wear cut resistant gloves and other personal protective equipment required for the p...

Страница 29: ...se a soft cloth together with a mild detergent and clean water Take care to avoid severe thermal shocks which might damage the module by cleaning modules with water which has a similar temperature to...

Страница 30: ...urface or not 5 Check whether the module support structure is leaning or bent or not 6 Check whether the connectors of the module are detached or not 7 After cleaning fill out the PV module cleaning r...

Страница 31: ...FICATION FOR SOLAR MODULE BARCODE Example PMC placed the order for the second time in one day the 3rd workshop produced a batch of 5BB mono with coating PV modules And the 3rd workshop started product...

Страница 32: ...ZXM6 LD60 330 M 330 33 6 9 83 40 8 10 35 1678 1002 30 22 Si Mono 158 75 158 75 20 1500 Class A ZXM6 LD72 380 M 380 39 8 9 55 48 5 10 07 2000 1002 30 26 Si Mono 158 75 158 75 20 1500 Class A ZXM6 LD72...

Страница 33: ...91 49 4 13 65 2256 1133 35 33 5 Si Mono 182 91 25 1500 Class A ZXM7 SPLDD144 535 M 535 41 3 12 96 49 6 13 71 2256 1133 35 33 5 Si Mono 182 91 25 1500 Class A ZXM7 SPLDD144 540 M 540 41 5 13 02 49 8 13...

Страница 34: ...www znshinesolar com Document No QES ZX RD III032A 31 9 Modify record Revision Date Version No Revisioner Remarks modifications chapters etc New 2020 10 13 A Full text of Installation Manual...

Отзывы: