45
Assembly Instructions
Unfold the Baby Stroller
• Take the stroller out of the package as shown in Fig. 1a
• Unfold the folding hook, pull the handlebar and gradually push to
open the stroller until a „click“ sound is heard as shown in
Fig. Ib and 1c
Install the Front Wheels
As shown in Fig. 2, attach each wheel to
the front wheel axle till a “click”
sound is heard.
Install the Rear wheel
As shown in Fig. 3, insert the rear wheels
into the rear wheel axle till a „click“ sound
is heard and ensure the rear wheels are
locked and cannot be pulled out.
1а
1b
1c
3
2
Folding Hook
13
Assembly Instructions
Unfold the Baby Stroller
• Take the stroller out of the package as shown in Fig. 1a
• Unfold the folding hook, pull the handlebar and gradually push to
open the stroller until a „click“ sound is heard as shown in
Fig. Ib and 1c
Install the Front Wheels
As shown in Fig. 2, attach each wheel to
the front wheel axle till a “click”
sound is heard.
Install the Rear wheel
As shown in Fig. 3, insert the rear wheels
into the rear wheel axle till a „click“ sound
is heard and ensure the rear wheels are
locked and cannot be pulled out.
1а
1b
1c
3
2
Folding Hook
13
Assemblaggio fasciatoio
1. Inserire il tubo corto nel tunnel in tessuto del lato corto; e inserire
il tubo lungo nel lato del tunnel del tessuto lungo. Il gancio corto
dovrebbe essere posizionato verso l’interno come nell’immagine.
7
8
TOY BAR &RING BALL &TOYS ASSEMBLY
parts list
toys
1.a
2.a
3.a
4.a
plastic toy bar(4pcs)
hang the toys on the bar 4.a
connect the toy bar 3.a with 2.a.
connect the bar 2.a with 1.a.
hang the bar 4.a on ring ball.
CHANGER TABLE ASSEMBLY
parts list
short tube(2pcs)
long tube(2pcs)
after assembly
insert the short tube into the short side's fabric tunnel; and insert the long tube into the
long fabric tunnel side. the short hook should put inward as the pic.
connect the short tube with long tube,
the spring will be locked in the hole.
put the assembled changer on top rail.
push and make sure the hook firmly grap
the top rail.
7
8
TOY BAR &RING BALL &TOYS ASSEMBLY
parts list
toys
1.a
2.a
3.a
4.a
plastic toy bar(4pcs)
hang the toys on the bar 4.a
connect the toy bar 3.a with 2.a.
connect the bar 2.a with 1.a.
hang the bar 4.a on ring ball.
CHANGER TABLE ASSEMBLY
parts list
short tube(2pcs)
long tube(2pcs)
after assembly
insert the short tube into the short side's fabric tunnel; and insert the long tube into the
long fabric tunnel side. the short hook should put inward as the pic.
connect the short tube with long tube,
the spring will be locked in the hole.
put the assembled changer on top rail.
push and make sure the hook firmly grap
the top rail.
2. Collegare il tubo corto con
il tubo lungo, la molla sarà
bloccata nel foro.
3. Posizionare il fasciatoio montato sul
binario superiore. Spingere e assicurarsi
che il gancio afferri saldamente il
binario superiore.
Elenco delle parti
Dopo il montaggio
Tubo lungo (2 pezzi)
Tubo corto (2 pezzi)
7
8
TOY BAR &RING BALL &TOYS ASSEMBLY
parts list
toys
1.a
2.a
3.a
4.a
plastic toy bar(4pcs)
hang the toys on the bar 4.a
connect the toy bar 3.a with 2.a.
connect the bar 2.a with 1.a.
hang the bar 4.a on ring ball.
CHANGER TABLE ASSEMBLY
parts list
short tube(2pcs)
long tube(2pcs)
after assembly
insert the short tube into the short side's fabric tunnel; and insert the long tube into the
long fabric tunnel side. the short hook should put inward as the pic.
connect the short tube with long tube,
the spring will be locked in the hole.
put the assembled changer on top rail.
push and make sure the hook firmly grap
the top rail.
7
8
TOY BAR &RING BALL &TOYS ASSEMBLY
parts list
toys
1.a
2.a
3.a
4.a
plastic toy bar(4pcs)
hang the toys on the bar 4.a
connect the toy bar 3.a with 2.a.
connect the bar 2.a with 1.a.
hang the bar 4.a on ring ball.
CHANGER TABLE ASSEMBLY
parts list
short tube(2pcs)
long tube(2pcs)
after assembly
insert the short tube into the short side's fabric tunnel; and insert the long tube into the
long fabric tunnel side. the short hook should put inward as the pic.
connect the short tube with long tube,
the spring will be locked in the hole.
put the assembled changer on top rail.
push and make sure the hook firmly grap
the top rail.
7
8
TOY BAR &RING BALL &TOYS ASSEMBLY
parts list
toys
1.a
2.a
3.a
4.a
plastic toy bar(4pcs)
hang the toys on the bar 4.a
connect the toy bar 3.a with 2.a.
connect the bar 2.a with 1.a.
hang the bar 4.a on ring ball.
CHANGER TABLE ASSEMBLY
parts list
short tube(2pcs)
long tube(2pcs)
after assembly
insert the short tube into the short side's fabric tunnel; and insert the long tube into the
long fabric tunnel side. the short hook should put inward as the pic.
connect the short tube with long tube,
the spring will be locked in the hole.
put the assembled changer on top rail.
push and make sure the hook firmly grap
the top rail.