10
Sub nose glued in place.
Transom doubler clamped in place.
Aft bottom sheet sanded and ready for fwd bottom.
Glue the tub sub nose to the very front of the tub.
This supports the nose for sheeting, and provides
a solid base for the tub nose block.
There should be a slight overhang on all sides so
that the sub nose can be sanded to shape later.
Glue in the transom doubler with epoxy.
Make sure that it fits flat against the transom, and
that it sits firmly on the tub bottom.
Clamp until cured.
When cured, remove the tub from the jig and flip
it over.
Put the upside down tub back in the jig.
Sand the front edge of the bottom sheet so that it
matches the angle of the forward bottom.
Содержание JAE GAS OutriggerV2
Страница 6: ...6 1 8 plywood parts plywood parts ...