![background image](http://html.mh-extra.com/html/zippkits/jae-gas-outriggerv2/jae-gas-outriggerv2_building-instructions_934994032.webp)
32
6-32 screw…
And nut.
Ski glued to bottom sheet.
We want a nicely supported, flat base before we
drill the boom tubes.
If you try to drill these holes with the tubes in the
tub, you will certainly induce some twist. Not
good.
When everything is looking good, drill a 5/32 hole
through the aluminum boom tube and the
sponson plug.
Put the supplied 6-32 screw and locknut in place.
Do this for all 4 corners.
Ski
Test fit the ski to the tub.
The rear of the ski should line up with the rear of
the transom, and the front should blend into the
tub bottom.
Measure from both sides and make small
alignment marks for the ski.
It should be centered on the tub bottom.
Содержание JAE GAS OutriggerV2
Страница 6: ...6 1 8 plywood parts plywood parts ...