TRANSPORT
ZIPPER MASCHINEN GmbH www.Zipper-Maschinen.at
56
ZI-MBGS600
13.1.1
Lift the machine from a transport pallet
Removing the metal frame:
•
Remove the M8 screws (1) fixing the metal
frame.
•
Remove the metal frame.
•
Remove the screw M12 (2) to loosen the bucket.
•
Loosen the belts that fix the machine.
3-point lifting:
Lifting position
•
Pull the boom (1) completely backwards and
bring it into the central position (see illustration
on the left).
•
Retract the arm (2) and bucket (3) completely.
•
The dozer (4) must be raised.
•
Swing the upper carriage 180° and lock it with
the locking lever (5).
•
From the operator's point of view, the dozer (4)
should now be at the rear of the machine.
WARNIN G
Risk of injury from suspended or unsecured load!
Damaged or insufficiently strong hoists and load slings can result in serious injury or even
death.
Before use, therefore, check hoists and load slings for adequate load-bearing ca-
pacity and perfect condition. Secure the loads carefully. Never stand under suspen-
ded loads!
Содержание ZI-MBGS600
Страница 90: ...ERSATZTEILE SPARE PARTS ZIPPER MASCHINEN GmbH www Zipper Maschinen at 90 ZI MBGS600...
Страница 91: ...ERSATZTEILE SPARE PARTS ZIPPER MASCHINEN GmbH www Zipper Maschinen at 91 ZI MBGS600...
Страница 92: ...ERSATZTEILE SPARE PARTS ZIPPER MASCHINEN GmbH www Zipper Maschinen at 92 ZI MBGS600...
Страница 93: ...ERSATZTEILE SPARE PARTS ZIPPER MASCHINEN GmbH www Zipper Maschinen at 93 ZI MBGS600...
Страница 94: ...ERSATZTEILE SPARE PARTS ZIPPER MASCHINEN GmbH www Zipper Maschinen at 94 ZI MBGS600 Engine...
Страница 96: ...ERSATZTEILE SPARE PARTS ZIPPER MASCHINEN GmbH www Zipper Maschinen at 96 ZI MBGS600 Hydraulic system...