Step D - Connecting the water supply
To prevent sediment from entering the HydroTap at connection, flush water
through the supply line thoroughly before connection to the HydroTap. Open
the access door and check that the filter is in place and secure. Connect the
water supply to the undersink unit using the attached flexible hose .Turn ON
water and check for leaks. If no leaks are evident turn the power ON.
Step E- Testing and commissioning
Filter Flush Mode
The display screen will show which model you have.
Have a bucket or similar container (not supplied) at the ready to hold a quantity
of water that is ejected while the Filter Flush Mode is in operation. Open the
filter access door on the front of the HydroTap and the filter cartridge will be
exposed. Located to the rear RHS of the cartridge is a fixed flush line, approx
600mm long and the flush line stop cock. Place the free end of the flush line
into the bucket or container (not supplied).
Turn “ON” both water and electricity supplies and open the flush line stop
cock. The display will show Filter Flush Mode. To activate press adjust
<
Run at least 7.5 Litres of water through to activate the filter membrane.
Press the adjust
<
button again to stop the Filter Flush Mode.
Turn OFF the
Filter Flush stop cock and re-locate the tube and stop cock in the filter
compartment.
Turning OFF the Filter Flush Mode puts the HydroTap into
calibration mode. Press adjust
<
to start calibration. The element will now
cycle ON and heat the water to 95ºC maintaining it at that temperature for a
short stabilization period.
Once stabilized, the element will cycle ON, bring the water to boiling point and
hold it there for a short period.
The unit now carries out a self calibration function to ensure correct
temperatures are maintained. During this period the Red LED on the Tap Head
assembly flashes slowly until the calibration function is complete.
Once this step is complete (approx 5 minutes) the unit will default to normal
operation.
When starting, both Boiling and Chilled cycles activate simultaneously after
calibration has taken place, the descriptions below indicate what happens
during each cycle.
Boiling
The unit is now running in normal operating mode. The Red LED will flash until
usable temperature is reached.
Before using the HydroTap wait 5 minutes after this point to allow adequate
fill time. The unit is now ready for use. Test water delivery from the tap and
check for appropriate temperatures. Use cable clips to tidy and secure wiring.
Chilled
When water and power is turned ON, the Blue LED flashes slowly on the Tap
Head assembly. The compressor activates and water begins to fill the chiller
tank at the prescribed rate. When the water is chilled to 12ºC the Blue LED on
the Tap Head assembly stops flashing and stays illuminated. The compressor
continues to chill down to 5º when it will cycle Off.
Ensure that the clock matches your local time. If not refer to page 15 . If
Energy Saver Settings are required, the instructions for installing these are
described on page 15 “Setting the Energy Saver Timer”.
Installation
procedure
continued
Boiling Water Lever
Chilled Water
Red Light White Light
Blue Light
Use these buttons to
scroll through the menu
Use these buttons to
activate and de-activate
the program selected