
Page 3 of 24
HydroTap Installation and Operating Instructions_Commercial_BCH 4in1_BH 3in1_October 2012_V1.05
Installation Checklist
Before Installation:
A.
Read the instructions
B.
Check the water pressure to determine if you require a pressure
reduction valve or a flow restrictor added or removed from the kit.
C.
Check the water quality to determine if extra filtration will be
required. A potable mains water supply must be used.
D.
Check the appliance rating plate and ensure correct power is
available for the appliance.
E.
Check the under counter cupboard supporting the appliance is
adequate for the total weight of the appliance, when full of water.
Before Commissioning:
1.
Check the unit has been installed correctly.
2.
Check all plumbing fittings have been tightened.
3.
Ensure the outlet and vent pipes are positioned to drain correctly.
4.
Ensure there is adequate ventilation.
5.
Check all tubes from the undersink unit to the tap, have a constant
rise and there are no sags or kinks in the hoses.
6.
Check all electrical connections are correct and there are no loose
wires.
Commission:
7.
Flush the supply line before connecting.
8.
Turn on the water and check for leaks.
9.
Flush the filter.
10.
Programme (select electronic models) to suit the customer’s
requirements.