Step H - Temperature set point adjustment
(Not normally required)
Temperature and Water level screen:
(Service Default Screen)
To access this default screen, on the right hand side of the screen, press the ‘
A
’ adjust buttons together until the screen
changes to Service Mode, it will show the following:
Hot
Temp
Lvl
Cold
Temp
Lvl
NOTE:
The temperatures shown are actual, not the set temperatures. To revert back to the Normal Operation screen,
press the adjust buttons together again until screen changes.
Press the Menu plus button, once,
to enter
the Hot Temperature Adjustment Screen:
Here you can adjust the Hot temperature set point by pressing the
A
adjust
>
or
>
buttons
.
The Hot temperature set
point can be raised or lowered in 0.5ºC increments between 68º - 100ºC.
Note:
the Maximum setting of 100ºC is not
recommended for normal use. Do not raise temperature above 98.5ºC without consulting Zip first to discuss the service
issue.
Press the Menu minus button, once, to return to the service default screen:
NOTE: On the BCH models the cold temperature set point can be adjusted as follows:
Press the Menu minus button, once, to enter the Cold Temperature Adjustment Screen:
Here you can adjust the Cold temperature set point by pressing the adjust
>
or
>
. The cold temperature set point can
be changed in 2ºC increments as follows: 5-9º ; 7-11º ; 9-13º or 11-15ºC.
Press the Menu minus button, once, to return to the service default screen:
To change the service default screen back to Normal Operation, press the adjust buttons together until the screen
changes back.
Warning:
Caution
must be observed when changing any settings within the Service Menu as changes may affect the normal
operation of the unit.
Hot Temp Lvl
Cold Temp Lvl
Menu plus
Menu minus
A
A
Installation Procedure
continued
Once this step is complete (approx 5 minutes) the unit will default to normal
operation.
When starting, both Boiling and Chilled cycles activate simultaneously after
calibration has taken place, the descriptions below indicate what happens during
each cycle.
Boiling
The unit is now running in normal operating mode. The Red LED will flash until
usable temperature is reached.
Before using the HydroTap wait 5 minutes after this point to allow adequate fill
time. The unit is now ready for use. Test water delivery from the tap and check for
appropriate temperatures. Use cable clips to tidy and secure wiring.
Chilled
When water and power is turned On, the Blue LED flashes slowly on the Tap Head assembly. The compressor activates
and water begins to fill the chiller tank at the prescribed rate. When the water is chilled to 15ºC the Blue LED on the Tap
Head assembly stops flashing and stays illuminated. The compressor continues to chill down to 5ºC when it will cycle Off.
Ensure that the clock matches your local time. If not refer to page 17. If Energy Saver Settings are required, the
instructions for installing these are described on page 17 “Setting the Energy Saver Timer”.
Boiling Water Lever
Chilled Water Lever
Red Light
White Light
Blue Light
Boiling
Filter Status
Chilled