
Operation manual
www.zigor.com
12
ZGR TOWER PRO 1KVA
ZGR TOWER PRO 1KVA LBT
ZGR TOWER PRO 2KVA
ZGR TOWER PRO 2KVA LBT
ZGR TOWER PRO 3KVA
ZGR TOWER PRO 3KVA LBT
1.
RS232 communication port
2.
USB communication port
3.
Input circuit breaker
4.
RJ45 overvoltage protection
5.
Input socket
6.
Expansion port
7.
External battery connector
8.
Non-essential outlets (SEGMENT1)
9.
Priority outlets (SEGMENT2)
10.
Output terminals
11.
EPO connection (near to USB)
Fig. 3-1 Rear panels of ZGR TOWER PRO 1-3KVA models
The nominal voltage for UPS input and outputs is 200/208/220/230/240 Vac, 50/60 Hz.
Connecting cables, both for UPS input and output, must be 3-wire connections (phase + n ground). In all
cases, connections are made by means of IEC type connectors, or terminals, depending on model.
Take the following steps into consideration in order to make the connections of the equipment:
1.
socket of the rear of the equipment, and the other end of the cable to the
appropriate mains outlet. The power cord is supplied in the UPS package.
At the rear of the unit there is access to an input circuit breaker.
2.
Connect the devices (loads) to the UPS outputs:
•
For socket-type outputs, simply connect devices to the IEC sockets.
•
For terminal-type outputs (if available), follow below steps:
o
Remove the small cover of the output terminals and connect the wires.
o
Upon completion of the wiring, check whether the wires are securely affixed.
o
Put the small cover back to the rear panel.
Содержание TOWER PRO 1 kVA
Страница 1: ...Operation Manual ZGR TOWER PRO 1 3 KVA Online single phase UPS www zigor com...
Страница 2: ......