Operation manual
www.zigor.com
11
3
INSTALLATION
Reception of material
Remove the UPS from the packaging and carry out a visual examination in order to detect any damage that might
have occurred during transport. Notify the seller about any damage.
List and check all the items indicated on the delivery note. Check that the material delivered corresponds with the
delivery note. Check the manufacturer´s identification plates located on the rear or side of the UPS.
Installation conditions
The place chosen for the installation must meet the following characteristics:
•
Protection against dust.
•
Protection against excessive humidity and heat sources.
•
Protection against atmospheric agents.
•
Avoid exposure to corrosive gases and agents.
•
Temperature of operating atmosphere b20º C and +25º C.
•
Easy connections.
•
Proximity to magnetic fields and high-power lamps must be avoided.
•
Prevent the UPS being exposed to the sun.
•
Do not obstruct the vents as this would prevent the correct dissipation of the heat produced by the UPS.
The minimum distance from the ventilation grills to walls or other obstacles must be 300mm.
Connections
All electrical connections of the UPS are made from the rear side of the device. Below is shown the rear panel
view of all models.
No claims will be accepted if, 24 hours following the delivery of the goods, no notification of reception of
material in bad conditions has been received and if this circumstance is not notified to the forwarding agent at
the time of delivery.
WARNING
The UPS contains lead batteries that are charged when they leave the factory.
They can be stored for up to two years provided that they are recharged on a periodic basis, at least every six
months, during storage.
Should these recommendations not be observed, the battery warranty will be rendered null and void.
Содержание TOWER PRO 1 kVA
Страница 1: ...Operation Manual ZGR TOWER PRO 1 3 KVA Online single phase UPS www zigor com...
Страница 2: ......