ZT MK2
38
Powering up the tail lift
www.zepro.com
Picture 53. Place fuse
and connect cabling
Picture 54. Correct installation
Picture 55. Incorrect installation
Picture 56. Cover, fuse box
1
2
3
4
7
Powering up the tail lift
1. Make sure that the main power switch is in the "OFF" position.
2. Connect the cable (1) between the battery’s positive terminal and the connection point and place the
fuse (2) above, see Picture 53.
3. Connect the main power cable (3) to the connection point, see Picture 53.
4.
Screw the cable connections and fuse into place using the knob (4). Install the cables at 90° or 180° from
each other. Install the fuse at right angles to the cables, see Picture 53.
The knob must lie against and centre the cable clip so that it does not come into contact with the bolt.
Incorrect installation can cause the fuse to be ineffective. Risk of fire in the event of a short circuit.
IMPORTANT
!
5. Install the fuse box cover.
6.
Set the main power switch in the "ON" position.