![Zepro ZS 150-135 Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/zepro/zs-150-135/zs-150-135_installation-instruction_3478291052.webp)
52
5-10 mm
Alt. 1
Alt. 2
Alt. 1
Alt. 2
5-10 mm
Slide out the lift, open the platform and
lift to the floor height.
Run the lift into the body, this is the
working position. Fasten the stop plate
when the red diode lamp lights up.
The distance between the sensor and
the stop plate (in both cases eg. 1
& 2) should be adjusted to between
5-10 mm.
9. Accessories
Working position indicator
The working position sensor is already
installed at the factory, therefore only
the stop plate needs to be installed
(see eg. 1 & 2) .
Eg. 1 Clamp. Clamped to slide profile.
Eg. 2 Screw, drill a hole and screw in
a bolt.
Содержание ZS 150-135
Страница 2: ......
Страница 8: ...8 ZT ZTS 150 200 250 ZS ZSS ZD 150 200 250 Loading Diagram 2 General ...
Страница 35: ...35 ZS ZD ZSS ZT ZTS 150 200 250 ML 6 Electric and hydraulic diagram ...
Страница 56: ...56 11 Markings decals ...
Страница 61: ......