![Zepro ZS 150-135 Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/zepro/zs-150-135/zs-150-135_installation-instruction_3478291028.webp)
28
max 280 Nm
ZS/ZSS/ZD-150/200/250
ZSS/ZTS-150/200/250
4. Slider installation
Pict. 3
Pict. 4
Check torque 80 Nm all
M12 bolts this side and
the motor bracket side
NB. All holes except for those for the bolts through the slots should be drilled after test running
the lift. Thus, the slide can be adjusted if necessary by movement in the slot.
min. 2 bolts
min. 4 bolts
Holes 14.0mm
Bolts M14
Hardness 10.9
Torque 95 Nm
NB. The mounting bracket fastening
plate should be installed perpendicular
to the support frame. Any imprecision
will result in an increased risk that the
chain wheel does not run straight along
the chain which will result in unneces-
sary wear and noise.
Содержание ZS 150-135
Страница 2: ......
Страница 8: ...8 ZT ZTS 150 200 250 ZS ZSS ZD 150 200 250 Loading Diagram 2 General ...
Страница 35: ...35 ZS ZD ZSS ZT ZTS 150 200 250 ML 6 Electric and hydraulic diagram ...
Страница 56: ...56 11 Markings decals ...
Страница 61: ......