![Zepro Z3N 75-100 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/zepro/z3n-75-100/z3n-75-100_installation-instruction_3496167041.webp)
Z3N/Z3NU/Z3NN/Z3NNU/Z3NW/Z3NWU 75-100
Powering up the tail lift
41
www.zepro.com
Image 54. C
onnection to the fuse box
1
2
3
4
7
Powering up the tail lift
1.
If applicable, ensure that the main switch is in the "Off" position.
2.
If applicable, ensure that the cab switch (CS) is in the "Off" position.
3. When using a fuse box, connect the cable (1) to the battery’s positive terminal and to the fuse box and
place the fuse (2) above, see Image 54.
4. When connecting directly to the positive battery terminal, place the fuse (2) on the positive terminal,
see Image 54.
5. Connect the main power cable (3) to the fuse box / positive terminal, see Image 54 - Image 54.
6. Screw tight the cable connections and fuse with the knob (4). Install the cables at 90° or 180° from each
other. Install the fuse at right angles to the cables; see Image 54 - Image 54.
IMPORTANT!
The knob must bear against and centre the cable lug so that it does not come into contact with the screw. Incorrect installation
can cause the fuse to be ineffective. Risk of fire in the event of a short circuit.
7. Install the fuse box cover.
8.
Where fitted, set the main switch to the ON position.
9.
Where fitted, set the cab switch to the ON position.
Image 55. Connection to the bat-
tery's positive terminal
Image 56. Correct installation
Image 57. Incorrect installation
Image 58. C
over, fuse box
2
3
4
Содержание Z3N 75-100
Страница 2: ......