32
9. Important information
Repainting
NB. If the cylinders are to be repainted, ensure that the
cylinder push rod and cover are not painted (this can
damage the seals/gaskets). This also applies to rubber
bellows if they exists!
Replace the transport plug
During installation the oil tank transport plug should be
removed and replaced
54853
54853
Hydraulic hoses or cables must not be painted, the
paint's solvent can damage the hose's/cables rubber
compound and can adversely affect durability.
min 40mm
10º
Moveable parts - free movement
When the final post-installation testing is carried
out, it is important that there is sufficient clearance
between the cylinders working envelopes and all
fixed points. During lift operation and cylinder mo
-
vement there is a risk for conflict with the subframe,
truck frame, number plate, lamp holders and even
the mounting brackets when the overhang is very
limited (due to lift arm angle). Hence it is important to
thoroughly check all of these points on both sides.
The final test is performed with the platform at floor
height tilted down 10° from the horizontal. The cylin-
ders must have a minimum clearance of 40 mm to all
fixed points from this position.
10º
Note! The platform must not be tilted down more
than max 10° below the horizontal.
Содержание Z 150-135
Страница 2: ......
Страница 9: ...9 Loading Diagram 2 General...
Страница 16: ...16 Z ZL 150 200 250 DA 6 Electric and hydraulic diagram...
Страница 34: ...34 10 Markings decals...